Red E Charging Station, 37 US-93, Alamo, NV
Red E Charging Station is an EV charging location at 37 US-93, Alamo, Nevada, with CHAdeMO and CCS1 across 2 charge points rated up to 52.3 kW.
- ConnectorsCHAdeMO, CCS1
- Charge points2
- Rated output52.3 kW
Where Red E Charging Station is
37 US-93, Alamo, NV 89001, USA
| Field | Value |
|---|---|
| Street | 37 US-93 |
| City | Alamo |
| State | Nevada |
| ZIP code | 89001 |
| Coordinates | 37.36372, -115.15969 |
Connectors and power at Red E Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CHAdeMO | DC | Fast charging on a highway stop |
| CCS1 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 52.3 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Red E Charging Station
Time to take a battery from 10 to 80 per cent at the 52.3 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 52.3 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 48 min |
| 80 kWh | 56 kWh | 1 hr 5 min |
| 100 kWh | 70 kWh | 1 hr 20 min |
Charging around Red E Charging Station
No other charging location is mapped within 3 mi of Red E Charging Station, so it is worth checking before you depend on it.
It is the only charging location Zevvy has mapped in Alamo.
Which cars can charge at Red E Charging Station
Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Red E Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Plan a trip through Alamo
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Red E Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Red E Charging Station have?
- CHAdeMO (DC fast) and CCS1 (DC fast) across 2 charge points, rated up to 52.3 kW.
- Is Red E Charging Station a fast charger?
- Yes. It has DC fast charging (CHAdeMO and CCS1), rated up to 52.3 kW.
- How long does it take to charge at Red E Charging Station?
- At its rated 52.3 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Red E Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Red E Charging Station?
- Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
