Zevvy Plan a route

Servotech EV Charging Station, Aurangabad

Servotech is an EV charging location at Aurangabad, Maharashtra, with CCS2 across 1 charge point rated up to 60 kW.

Where Servotech is

V8GW+MRX Indian Overseas bank, जलना मार्ग, opposite SFC School, near chetan trade center, Opp. S.F.S. School, Venkatesh Nagar, Mondha, Chhatrapati Sambhajinagar, Maharashtra 431001, India

Location detail for Servotech
FieldValue
CityAurangabad
StateMaharashtra
Coordinates19.87676, 75.34735
From Aurangabad centre0.4 km east

Connectors and power at Servotech

Connector types recorded at Servotech
ConnectorCurrentTypical use
CCS2DCFast charging on a highway stop

The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Servotech

Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Servotech
Battery sizeEnergy addedMinimum time
30 kWh21 kWh21 min
45 kWh31.5 kWh31 min
60 kWh42 kWh42 min

Charging around Servotech

8 other charging locations are mapped within 5 km of Servotech, 8 of them with DC fast charging.

Servotech is one of 19 charging locations Zevvy has mapped in Aurangabad, and one of 19 with DC fast charging. No location in Aurangabad has a higher recorded output than its 60 kW.

Which cars can charge at Servotech

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at Servotech
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2
MG Windsor EV332 kmCCS2

Is it working?

Zevvy has no live status for Servotech, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Servotech

Plan a trip through Aurangabad

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Servotech working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Servotech have?
CCS2 (DC fast) across 1 charge point, rated up to 60 kW.
Is Servotech a fast charger?
Yes. It has DC fast charging (CCS2), rated up to 60 kW.
How long does it take to charge at Servotech?
At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Servotech?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Servotech?
Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
What is the nearest alternative to Servotech?
Adani Charging Station, 0.1 km away, with CCS2. 4 further alternatives are listed on this page.

More charging near Servotech