Statiq Charging Station, Haridwar, Badheri Rajputan
Statiq Charging Station is an EV charging location at Haridwar, Badheri Rajputan, Uttarakhand, with CCS2 across 3 charge points rated up to 180 kW.
- ConnectorsCCS2
- Charge points3
- Rated output180 kW
Where Statiq Charging Station is
National Food Court, Haridwar Delhi, Road, adjoining Crystal Water Park, Haridwar, Badheri Rajputan, Uttarakhand 249405, India
| Field | Value |
|---|---|
| Locality | Haridwar |
| City | Badheri Rajputan |
| State | Uttarakhand |
| Coordinates | 29.90004, 77.98518 |
Connectors and power at Statiq Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 180 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Statiq Charging Station
Time to take a battery from 10 to 80 per cent at the 180 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 180 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 7 min |
| 45 kWh | 31.5 kWh | 11 min |
| 60 kWh | 42 kWh | 14 min |
Charging around Statiq Charging Station
4 other charging locations are mapped within 5 km of Statiq Charging Station, 3 of them with DC fast charging.
Statiq Charging Station is one of 2 charging locations Zevvy has mapped in Badheri Rajputan, and one of 2 with DC fast charging. No location in Badheri Rajputan has a higher recorded output than its 180 kW.
Which cars can charge at Statiq Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Statiq Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Statiq Charging Station
- Hindustan Petroleum Corporation Limited Charging Station334, National Highway, Badheri Rajputan, Uttarakhand 249405, India0.3 km away · east
- BPCL Charging StationBELDA AHATMAL,ROORKEE,HARIDWAR Rurki, VXP4+7HP, Sohalpur Mazara Belra M, Uttarakhand 247667, India3.2 km away · south-west
- JoulePoint Charging StationVXP4+2H, Sohalpur Mazara Belra M, Uttarakhand 247667, India3.2 km away · south-west
- Hindustan Petroleum Corporation Limited Charging StationW2FG+Q4M, Haridwar, Uttarakhand 249402, India4.7 km away · north-east
- BPCL Charging StationW2PW+8VJ, Salempur Mahdood, Bahadarabad, Uttarakhand 249402, India7.2 km away · north-east
Plan a trip through Badheri Rajputan
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Statiq Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Statiq Charging Station have?
- CCS2 (DC fast) across 3 charge points, rated up to 180 kW.
- Is Statiq Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 180 kW.
- How long does it take to charge at Statiq Charging Station?
- At its rated 180 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 11 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Statiq Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Statiq Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Statiq Charging Station?
- Hindustan Petroleum Corporation Limited Charging Station, 0.3 km away, with CCS2. 4 further alternatives are listed on this page.
