Zevvy Plan a route

Blusmart Charging Station Electronic City Phase 1, Bommasandra, Bengaluru, Karnataka

Blusmart Charging Station Electronic City Phase 1 is a JIO BP Pulse charging location at Bommasandra, Bengaluru, Karnataka, with CCS2, IEC 60309 industrial (3-pin), Type 2 AC and GB/T DC across 4 charge points rated up to 60 kW.

Where Blusmart Charging Station Electronic City Phase 1 is

Maragondanahalli, Bommasandra, Bengaluru, Karnataka, 560100

Location detail for Blusmart Charging Station Electronic City Phase 1
FieldValue
LocalityBommasandra
CityBengaluru
StateKarnataka
PIN code560100
Coordinates12.82734, 77.65552
From Bengaluru centre17.3 km south
Network operatorJIO BP Pulse

Connectors and power at Blusmart Charging Station Electronic City Phase 1

Connector types recorded at Blusmart Charging Station Electronic City Phase 1
ConnectorCurrentTypical use
CCS2DCFast charging on a highway stop
IEC 60309 industrial (3-pin)ACSlower top-up over a longer stay
Type 2 ACACSlower top-up over a longer stay
GB/T DCDCFast charging on a highway stop

The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Blusmart Charging Station Electronic City Phase 1

Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Blusmart Charging Station Electronic City Phase 1
Battery sizeEnergy addedMinimum time
30 kWh21 kWh21 min
45 kWh31.5 kWh31 min
60 kWh42 kWh42 min

Charging around Blusmart Charging Station Electronic City Phase 1

18 other charging locations are mapped within 5 km of Blusmart Charging Station Electronic City Phase 1, 13 of them with DC fast charging.

Blusmart Charging Station Electronic City Phase 1 is one of 339 charging locations Zevvy has mapped in Bengaluru, and one of 255 with DC fast charging. 54 locations in Bengaluru have a higher recorded output than its 60 kW.

Which cars can charge at Blusmart Charging Station Electronic City Phase 1

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at Blusmart Charging Station Electronic City Phase 1
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
Mahindra eVerito140 kmType 2 AC
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2

Is it working?

Zevvy has no live status for Blusmart Charging Station Electronic City Phase 1, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Blusmart Charging Station Electronic City Phase 1

Plan a trip through Bengaluru

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Blusmart Charging Station Electronic City Phase 1 working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Blusmart Charging Station Electronic City Phase 1 have?
CCS2 (DC fast), IEC 60309 industrial (3-pin) (AC), Type 2 AC (AC) and GB/T DC (DC fast) across 4 charge points, rated up to 60 kW.
Is Blusmart Charging Station Electronic City Phase 1 a fast charger?
Yes. It has DC fast charging (CCS2 and GB/T DC), rated up to 60 kW.
How long does it take to charge at Blusmart Charging Station Electronic City Phase 1?
At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Blusmart Charging Station Electronic City Phase 1?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. JIO BP Pulse sets the tariff at this site; check their app or the unit before plugging in.
Which cars can charge at Blusmart Charging Station Electronic City Phase 1?
Any car with CCS2, IEC 60309 industrial (3-pin), Type 2 AC and GB/T DC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
What is the nearest alternative to Blusmart Charging Station Electronic City Phase 1?
Tata Power Charging Station, 1.1 km away, with Type 2 AC and CCS2. 4 further alternatives are listed on this page.

More charging near Blusmart Charging Station Electronic City Phase 1