BPCL Charging Station, Konappana Agrahara, Bengaluru, Karnataka
BPCL Charging Station is a Statiq charging location at Bengaluru, Karnataka, with CCS2 across 1 charge point rated up to 25 kW.
- ConnectorsCCS2
- Charge points1
- Rated output25 kW
- NetworkStatiq
Where BPCL Charging Station is
VM38+8V4, Konappana Agrahara, Electronic City, Konappana Agrahara, Karnataka 560100, India
| Field | Value |
|---|---|
| City | Bengaluru |
| State | Karnataka |
| Coordinates | 12.85325, 77.66720 |
| From Bengaluru centre | 15.3 km south-east |
| Network operator | Statiq |
Connectors and power at BPCL Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 25 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at BPCL Charging Station
Time to take a battery from 10 to 80 per cent at the 25 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 25 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 50 min |
| 45 kWh | 31.5 kWh | 1 hr 15 min |
| 60 kWh | 42 kWh | 1 hr 40 min |
Charging around BPCL Charging Station
27 other charging locations are mapped within 5 km of BPCL Charging Station, 18 of them with DC fast charging.
BPCL Charging Station is one of 339 charging locations Zevvy has mapped in Bengaluru, and one of 255 with DC fast charging. 190 locations in Bengaluru have a higher recorded output than its 25 kW.
Which cars can charge at BPCL Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for BPCL Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to BPCL Charging Station
- Charzer Charging StationVM2F+9HR, Konappana Agrahara, Electronic City, Konappana Agrahara, Karnataka 560100, India0.8 km away · east
- Tata Power Charging StationTata Power Solar, Electronic City Rd, Phase II, Electronic City, Bengaluru, Konappana Agrahara, Karnataka 560100, India1.1 km away · south-east
- Metro Cash&Carry5/2, NH - 44, Lavakusha Nagar, Bengaluru, Karnataka , 5601001.1 km away · north-west
- Tata Power Charging StationProperty No 36/6, JSP AUTOCARE PVT LTD, Doddanagala Main Road, Doddanagamangala Village, Holbli, Begur, Doddanagamangala Village, Karnataka 560100, India1.3 km away · north
- Statiq x TATA.ev MegaChargerMonk Mansion, Electronic City Phase I, Electronic City, Konappana Agrahara, Karnataka 560100, India1.3 km away · south
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is BPCL Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does BPCL Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 25 kW.
- Is BPCL Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 25 kW.
- How long does it take to charge at BPCL Charging Station?
- At its rated 25 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 15 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at BPCL Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Statiq sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at BPCL Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to BPCL Charging Station?
- Charzer Charging Station, 0.8 km away, with Type 2 AC. 4 further alternatives are listed on this page.
