ElectricPe Charging Station, Brookefield, Bengaluru, Karnataka
ElectricPe Charging Station is an EV charging location at Brookefield, Bengaluru, Karnataka, with CCS2 across 3 charge points rated up to 3.3 kW.
- ConnectorsCCS2
- Charge points3
- Rated output3.3 kW
Where ElectricPe Charging Station is
XP4H+C9J, Brookefield, Bengaluru, Karnataka 560066, India
| Field | Value |
|---|---|
| Locality | Brookefield |
| City | Bengaluru |
| State | Karnataka |
| Coordinates | 12.95610, 77.72840 |
| From Bengaluru centre | 14.6 km east |
Connectors and power at ElectricPe Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 3.3 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at ElectricPe Charging Station
Time to take a battery from 10 to 80 per cent at the 3.3 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.3 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 6 hr 20 min |
| 45 kWh | 31.5 kWh | 9 hr 35 min |
| 60 kWh | 42 kWh | 12 hr 45 min |
Charging around ElectricPe Charging Station
53 other charging locations are mapped within 5 km of ElectricPe Charging Station, 47 of them with DC fast charging.
ElectricPe Charging Station is one of 339 charging locations Zevvy has mapped in Bengaluru, and one of 255 with DC fast charging. 309 locations in Bengaluru have a higher recorded output than its 3.3 kW.
Which cars can charge at ElectricPe Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for ElectricPe Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to ElectricPe Charging Station
- Jio-bp Pulse Hub, Siddhapura#244 Shop No 1 Varthur Main Road, Bengaluru, Karnataka , 5600660.2 km away · north-east
- goEgo EV CHARGE PARKSRIT House, #113/1B, ITPL Main Road, Bengaluru, Karnataka , 5600371.4 km away · north-west
- Relux Charging StationNo:113, 1B, ITPL Main Rd, Kundalahalli, Brookefield, Bengaluru, Karnataka 560037, India1.4 km away · north-west
- JLR Shakti AutoJaguar and Land Rover, #36 Kundalahalli Main Road, Bengaluru, Karnataka, 5600371.5 km away · north-west
- Statiq Charging StationDivyasree Republic Of Whitefield, 36/2 & 36/3, Kundalahalli, Brookefield, Bengaluru, Karnataka 560066, India1.7 km away · north
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is ElectricPe Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does ElectricPe Charging Station have?
- CCS2 (DC fast) across 3 charge points, rated up to 3.3 kW.
- Is ElectricPe Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 3.3 kW.
- How long does it take to charge at ElectricPe Charging Station?
- At its rated 3.3 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 9 hr 35 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at ElectricPe Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at ElectricPe Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to ElectricPe Charging Station?
- Jio-bp Pulse Hub, Siddhapura, 0.2 km away, with CCS2, IEC 60309 industrial (3-pin) and GB/T DC. 4 further alternatives are listed on this page.
