Kurrent Charging Station, Vasanth Nagar, Bengaluru, Karnataka
Kurrent Charging Station is an EV charging location at Vasanth Nagar, Bengaluru, Karnataka, with CCS2 across 1 charge point rated up to 43 kW.
- ConnectorsCCS2
- Charge points1
- Rated output43 kW
Where Kurrent Charging Station is
Embassy Icon, Infantry Rd, Cubbon Park, Vasanth Nagar, Bengaluru, Karnataka 560001, India
| Field | Value |
|---|---|
| Locality | Vasanth Nagar |
| City | Bengaluru |
| State | Karnataka |
| Coordinates | 12.98369, 77.59580 |
| From Bengaluru centre | 1.4 km north |
Connectors and power at Kurrent Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 43 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Kurrent Charging Station
Time to take a battery from 10 to 80 per cent at the 43 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 43 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 29 min |
| 45 kWh | 31.5 kWh | 44 min |
| 60 kWh | 42 kWh | 59 min |
Charging around Kurrent Charging Station
51 other charging locations are mapped within 5 km of Kurrent Charging Station, 38 of them with DC fast charging.
Kurrent Charging Station is one of 339 charging locations Zevvy has mapped in Bengaluru, and one of 255 with DC fast charging. 147 locations in Bengaluru have a higher recorded output than its 43 kW.
Which cars can charge at Kurrent Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Kurrent Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Kurrent Charging Station
- BESCOM Charging StationBESCOM Police Commissioner Office, Vasanth Nagar, Bengaluru, Karnataka 560001, India0.2 km away · north-west
- Nikol EV Charging StationNovel Office, Novel Office, Queens Rd, Govinda Chetty Colony, Vasanth Nagar, Bengaluru, Karnataka 560001, India0.9 km away · north-east
- Ather Grid Point - 6000 Miles to Isle of ManKasturba Road, Bengaluru, Bangalore Urban, 5600530.9 km away · south
- Suzuki Motorcycle Charging StationNo.-16/A, Millers Rd, Kaverappa Layout, Vasanth Nagar, Bengaluru, Karnataka 560052, India1.0 km away · north
- Mercedes-Benz Charging Station107, Kasturba Rd, opp. Venkatappa Art Gallery, Shanthala Nagar, Ashok Nagar, Bengaluru, Karnataka 560001, India1.1 km away · south
Plan a trip through Bengaluru
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Kurrent Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Kurrent Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 43 kW.
- Is Kurrent Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 43 kW.
- How long does it take to charge at Kurrent Charging Station?
- At its rated 43 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 44 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Kurrent Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Kurrent Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Kurrent Charging Station?
- BESCOM Charging Station, 0.2 km away, with Type 2 AC. 4 further alternatives are listed on this page.
