Ather Grid Charging Station, Patia, Bhubaneswar
Ather Grid Charging Station is an EV charging location at Patia, Bhubaneswar, Odisha, with CHAdeMO across 2 charge points rated up to 8.5 kW.
- ConnectorsCHAdeMO
- Charge points2
- Rated output8.5 kW
Where Ather Grid Charging Station is
The Big Bike Hub Cafe, Plot no-516, KIIT Rd, opposite Big Bazar, Patia, Bhubaneswar, Odisha 751024, India
| Field | Value |
|---|---|
| Locality | Patia |
| City | Bhubaneswar |
| State | Odisha |
| Coordinates | 20.35483, 85.82725 |
| From Bhubaneswar centre | 6.5 km north |
Connectors and power at Ather Grid Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CHAdeMO | DC | Fast charging on a highway stop |
The highest output recorded for this location is 8.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Ather Grid Charging Station
Time to take a battery from 10 to 80 per cent at the 8.5 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 8.5 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 2 hr 30 min |
| 45 kWh | 31.5 kWh | 3 hr 40 min |
| 60 kWh | 42 kWh | 4 hr 55 min |
Charging around Ather Grid Charging Station
9 other charging locations are mapped within 5 km of Ather Grid Charging Station, 8 of them with DC fast charging.
Ather Grid Charging Station is one of 45 charging locations Zevvy has mapped in Bhubaneswar, and one of 42 with DC fast charging. 42 locations in Bhubaneswar have a higher recorded output than its 8.5 kW.
Which cars can charge at Ather Grid Charging Station
Any car with a CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Ather Grid Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Ather Grid Charging Station
- Tata Power Charging StationSG Complex, Plot no. 13 & 14, Ln 3, Adarsh Vihar, Patia, Bhubaneswar, Odisha 751024, India0.1 km away · north
- Tata Power Charging StationPlot No: 66&72, Infront of KIIT Khata Jodi Campus, KIIT Rd, Chandaka Industrial Estate, Patia, Bhubaneswar, Odisha 751024, India1.1 km away · west
- Kurrent Charging StationZ1 VYON, Nandankanan Rd, Kalarahanga, Bhubaneswar, Odisha 751024, India1.4 km away · north-east
- GLIDA Charging StationIdco Info Park, Technology Corridor, Chandaka Industrial Estate, Patia, Bhubaneswar, Odisha 751024, India2.1 km away · west
- Tata Power Charging StationGROUND Building No./Flat No.: NA Name Of Premises/Building: Royal Arcade Road/Street: Nandankanan Road Nearby Landmark: Royal Arcade Shopping Complex Mall Locality/Sub Locality: Raghunathpur City/Town/Village: Bhubaneswar District: Khordha State: Odisha KHORDA, 9RFJ+MCP, Raghunathpur, Raghunathpurjali, Odisha 751024, India2.2 km away · north
Plan a trip through Bhubaneswar
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Ather Grid Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Ather Grid Charging Station have?
- CHAdeMO (DC fast) across 2 charge points, rated up to 8.5 kW.
- Is Ather Grid Charging Station a fast charger?
- Yes. It has DC fast charging (CHAdeMO), rated up to 8.5 kW.
- How long does it take to charge at Ather Grid Charging Station?
- At its rated 8.5 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 3 hr 40 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Ather Grid Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Ather Grid Charging Station?
- Any car with a CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
- What is the nearest alternative to Ather Grid Charging Station?
- Tata Power Charging Station, 0.1 km away, with Type 2 AC and CCS2. 4 further alternatives are listed on this page.
