Bowling Green State University - Parking Lot E EV Charging Station, Pike St & Thurstin Ave, Bowling Green, OH
Bowling Green State University - Parking Lot E is an EV charging location at Pike St & Thurstin Ave, Bowling Green, Ohio, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
Where Bowling Green State University - Parking Lot E is
Pike St & Thurstin Ave, Bowling Green, OH, 43403
| Field | Value |
|---|---|
| Street | Pike St & Thurstin Ave |
| City | Bowling Green |
| State | Ohio |
| Coordinates | 41.37685, -83.64441 |
Connectors and power at Bowling Green State University - Parking Lot E
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Bowling Green State University - Parking Lot E
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Bowling Green State University - Parking Lot E
4 other charging locations are mapped within 3 mi of Bowling Green State University - Parking Lot E, 1 of them with DC fast charging. Bowling Green State University - Parking Lot E has no DC fast charging recorded; the closest location that does is InCharge Charging Station, 1.5 mi north.
Bowling Green State University - Parking Lot E is one of 5 charging locations Zevvy has mapped in Bowling Green; 1 of them has DC fast charging. 2 locations in Bowling Green have a higher recorded output than its 3.7 kW.
Which cars can charge at Bowling Green State University - Parking Lot E
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Bowling Green State University - Parking Lot E, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Bowling Green State University - Parking Lot E
- Bowling Green State University - Parking Lot 8707 E Merry Ave, Bowling Green, OH, 434030.4 mi away · north
- Bowling Green State University - Parking Lot 20E Wooster St, Bowling Green, OH, 434031.1 mi away · east
- InCharge Charging Station1225 N Main St, Bowling Green, OH 43402, USA1.5 mi away · north
- Nissan Charging Station18039 N Dixie Hwy, Bowling Green, OH 43402, USA2.8 mi away · north
- ChargePoint Charging Station5501 S Wilkinson Way, Perrysburg, OH 43551, USA10.1 mi away · north
Plan a trip through Bowling Green
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Bowling Green State University - Parking Lot E working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Bowling Green State University - Parking Lot E have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Bowling Green State University - Parking Lot E a fast charger?
- No. Only AC charging is recorded at Bowling Green State University - Parking Lot E, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is InCharge Charging Station, 1.5 mi away.
- How long does it take to charge at Bowling Green State University - Parking Lot E?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Bowling Green State University - Parking Lot E?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Bowling Green State University - Parking Lot E?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Bowling Green State University - Parking Lot E?
- Bowling Green State University - Parking Lot 8, 0.4 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.
