Zevvy Plan a route

Adani Charging Station, Bombay Picnic Spot, Chaler

Adani Charging Station is an EV charging location at Bombay Picnic Spot, Chaler, Himachal Pradesh, with CCS2 across 2 charge points rated up to 30 kW.

Where Adani Charging Station is

Bombay Picnic Spot, Sidh Chaler, Sidh, Chaler, Himachal Pradesh 177202, India

Location detail for Adani Charging Station
FieldValue
LocalityBombay Picnic Spot
CityChaler
StateHimachal Pradesh
Coordinates31.72881, 76.09517

Connectors and power at Adani Charging Station

Connector types recorded at Adani Charging Station
ConnectorCurrentTypical use
CCS2DCFast charging on a highway stop

The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Adani Charging Station

Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Adani Charging Station
Battery sizeEnergy addedMinimum time
30 kWh21 kWh42 min
45 kWh31.5 kWh1 hr 5 min
60 kWh42 kWh1 hr 25 min

Charging around Adani Charging Station

No other charging location is mapped within 5 km of Adani Charging Station, so it is worth checking before you depend on it.

It is the only charging location Zevvy has mapped in Chaler.

Which cars can charge at Adani Charging Station

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at Adani Charging Station
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2
MG Windsor EV332 kmCCS2

Is it working?

Zevvy has no live status for Adani Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Adani Charging Station

Plan a trip through Chaler

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Adani Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Adani Charging Station have?
CCS2 (DC fast) across 2 charge points, rated up to 30 kW.
Is Adani Charging Station a fast charger?
Yes. It has DC fast charging (CCS2), rated up to 30 kW.
How long does it take to charge at Adani Charging Station?
At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Adani Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Adani Charging Station?
Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
What is the nearest alternative to Adani Charging Station?
Hindustan Petroleum Corporation Limited Charging Station, 11.3 km away, with CCS2. 1 further alternative is listed on this page.

More charging near Adani Charging Station