Zevvy Plan a route

EVgo Charging Station, 2349 Marlton Pike, Cherry Hill Township, NJ

EVgo Charging Station is an EV charging location at 2349 Marlton Pike, Cherry Hill Township, New Jersey, with NACS (Tesla) and CCS1 across 2 charge points rated up to 150 kW.

Where EVgo Charging Station is

2349 Marlton Pike, Cherry Hill Township, NJ 08002, USA

Location detail for EVgo Charging Station
FieldValue
Street2349 Marlton Pike
CityCherry Hill Township
StateNew Jersey
ZIP code08002
Coordinates39.92652, -75.05310

Connectors and power at EVgo Charging Station

Connector types recorded at EVgo Charging Station
ConnectorCurrentTypical use
NACS (Tesla)DCFast charging on a highway stop
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 150 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at EVgo Charging Station

Time to take a battery from 10 to 80 per cent at the 150 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 150 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at EVgo Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh17 min
80 kWh56 kWh22 min
100 kWh70 kWh28 min

Charging around EVgo Charging Station

18 other charging locations are mapped within 3 mi of EVgo Charging Station, 6 of them with DC fast charging.

EVgo Charging Station is one of 18 charging locations Zevvy has mapped in Cherry Hill Township, and one of 7 with DC fast charging. 4 locations in Cherry Hill Township have a higher recorded output than its 150 kW.

Which cars can charge at EVgo Charging Station

Any car with a NACS (Tesla) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for EVgo Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to EVgo Charging Station

Plan a trip through Cherry Hill Township

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is EVgo Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does EVgo Charging Station have?
NACS (Tesla) (DC fast) and CCS1 (DC fast) across 2 charge points, rated up to 150 kW.
Is EVgo Charging Station a fast charger?
Yes. It has DC fast charging (NACS (Tesla) and CCS1), rated up to 150 kW.
How long does it take to charge at EVgo Charging Station?
At its rated 150 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 22 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at EVgo Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at EVgo Charging Station?
Any car with a NACS (Tesla) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to EVgo Charging Station?
Blink Charging Station, 0.4 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near EVgo Charging Station