Zevvy Plan a route

ChargePoint Charging Station, Chiriaco Summit, CA

ChargePoint Charging Station is an EV charging location at Chiriaco Summit, California, with CCS1, J1772 (Type 1) and CHAdeMO across 3 charge points rated up to 62.5 kW.

Where ChargePoint Charging Station is

Chiriaco Summit, CA 92201, USA

Location detail for ChargePoint Charging Station
FieldValue
CityChiriaco Summit
StateCalifornia
ZIP code92201
Coordinates33.66110, -115.72052

Connectors and power at ChargePoint Charging Station

Connector types recorded at ChargePoint Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop
J1772 (Type 1)ACSlower top-up over a longer stay
CHAdeMODCFast charging on a highway stop

The highest output recorded for this location is 62.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

Which cars can charge at ChargePoint Charging Station

Any car with a CCS1, J1772 (Type 1) and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Reported status and reviews

Zevvy records no independently verified working status for any charger in this dataset, and does not publish one it cannot stand behind. Google users rate ChargePoint Charging Station 2.6 out of 5 from 14 reviews.

What drivers have written

“Rated at 50+, but we're only getting 22. No one else is charging, so it's not overloaded.” — Dave Scheel, 6 months ago

“Works but slow. Charged my model 3 at a rate of 29 miles per hour. Nice tho and easy to use. Did have an issue with the adapter staying in the car when I took the plug out. If you have a Tesla; make sure to take the adapter out not the plug so it doesn't happen to you..” — Stephen Sullivan, 4 years ago

“Have used these chargers several times in the past with no problems. However this time the charger by the Chevron was dead and the one by the coffee shop said that it was sharing power with another charger and would take longer to charge. It only charged me at 5 kW so it took me 24 minutes to get from 77% to 80%! There are two level two chargers next to each of the level three chargers and the one next to mine wasn't even plugged into another car; I don't know what they thought they were sharing power with 😤.” — Natashja Kelly, 4 years ago

Plan a trip through Chiriaco Summit

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is ChargePoint Charging Station working right now?
Zevvy does not hold a verified live status for this charger, so we do not claim one. Google users rate it 2.6 out of 5 from 14 reviews, which is a signal about the site rather than about the bay being free today. Check the live planner before you rely on it, and see the alternatives listed on this page.
What connectors does ChargePoint Charging Station have?
CCS1 (DC fast), J1772 (Type 1) (AC) and CHAdeMO (DC fast) across 3 charge points, rated up to 62.5 kW.
How much does it cost to charge at ChargePoint Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at ChargePoint Charging Station?
Any car with a CCS1, J1772 (Type 1) and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

More charging near ChargePoint Charging Station