Metis N4 Construction EV Charging Station, 40 1 Ave NW, Dauphin, MB
Metis N4 Construction is an EV charging location at 40 1 Ave NW, Dauphin, Manitoba, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
Where Metis N4 Construction is
40 1 Ave NW, Dauphin, MB, R7N 1G8
| Field | Value |
|---|---|
| Street | 40 1 Ave NW |
| City | Dauphin |
| Province | Manitoba |
| Coordinates | 51.15072, -100.05170 |
Connectors and power at Metis N4 Construction
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Metis N4 Construction
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Metis N4 Construction
5 other charging locations are mapped within 5 km of Metis N4 Construction, 2 of them with DC fast charging. Metis N4 Construction has no DC fast charging recorded; the closest location that does is FLO Charging Station, 0.3 km south.
Metis N4 Construction is one of 6 charging locations Zevvy has mapped in Dauphin; 2 of them have DC fast charging. 3 locations in Dauphin have a higher recorded output than its 3.7 kW.
Which cars can charge at Metis N4 Construction
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Metis N4 Construction, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Metis N4 Construction
- FLO Charging Station100 Main St S, Dauphin, MB R7N 1K3, Canada0.3 km away · south
- Flo Charging Station525 Main St S, Dauphin, MB R7N 1V3, Canada0.6 km away · south-west
- FLO Charging Station1212 Main St S, Dauphin, MB R7N 1Z4, Canada1.4 km away · south-west
- FLO Charging Station1600 Main St S, Dauphin, MB R7N 3B3, Canada2.1 km away · south
- Canway Inn & Suites Dauphin1601 Main St S, Dauphin, MB, R7N 2V42.2 km away · south-west
Plan a trip through Dauphin
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Metis N4 Construction working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Metis N4 Construction have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Metis N4 Construction a fast charger?
- No. Only AC charging is recorded at Metis N4 Construction, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is FLO Charging Station, 0.3 km away.
- How long does it take to charge at Metis N4 Construction?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Metis N4 Construction?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Metis N4 Construction?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Metis N4 Construction?
- FLO Charging Station, 0.3 km away, with CCS1 and CHAdeMO. 4 further alternatives are listed on this page.
