Wastewater Operations and Control Building EV Charging Station, 2800 Guthrie Rd, Dayton, OH
Wastewater Operations and Control Building is a AmpUp charging location at 2800 Guthrie Rd, Dayton, Ohio, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
- NetworkAmpUp
Where Wastewater Operations and Control Building is
2800 Guthrie Rd, Dayton, OH, 45417
| Field | Value |
|---|---|
| Street | 2800 Guthrie Rd |
| City | Dayton |
| State | Ohio |
| Coordinates | 39.72461, -84.23112 |
| Network operator | AmpUp |
Connectors and power at Wastewater Operations and Control Building
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Wastewater Operations and Control Building
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Wastewater Operations and Control Building
21 other charging locations are mapped within 3 mi of Wastewater Operations and Control Building, 1 of them with DC fast charging. Wastewater Operations and Control Building has no DC fast charging recorded; the closest location that does is Red E Charging Station, 1.4 mi north-east.
Wastewater Operations and Control Building is one of 74 charging locations Zevvy has mapped in Dayton; 9 of them have DC fast charging. 70 locations in Dayton have a higher recorded output than its 3.7 kW.
Which cars can charge at Wastewater Operations and Control Building
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Wastewater Operations and Control Building, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Wastewater Operations and Control Building
- Red E Charging Station2121 S Edwin C Moses Blvd, Dayton, OH 45417, USA1.4 mi away · north-east
- Tesla Destination Charger2006 S Edwin C Moses Blvd, Dayton, OH 45417, USA1.6 mi away · east
- Blink Charging Station4790 Frytown Rd, Dayton, OH 45417, USA1.9 mi away · west
- Blink Charging Station1400 W Dorothy Ln, Dayton, OH 45409, USA2.1 mi away · south-east
- Blink Charging Station2021 W Third St, Dayton, OH 45417, USA2.1 mi away · north
Plan a trip through Dayton
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Wastewater Operations and Control Building working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Wastewater Operations and Control Building have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Wastewater Operations and Control Building a fast charger?
- No. Only AC charging is recorded at Wastewater Operations and Control Building, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Red E Charging Station, 1.4 mi away.
- How long does it take to charge at Wastewater Operations and Control Building?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Wastewater Operations and Control Building?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. AmpUp sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Wastewater Operations and Control Building?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Wastewater Operations and Control Building?
- Red E Charging Station, 1.4 mi away, with CCS1. 4 further alternatives are listed on this page.
