Thunder Plus Charging Station, Dehradun
Thunder Plus Charging Station is an EV charging location at Dehradun, Uttarakhand, with CCS2 and Type 2 AC across 2 charge points rated up to 60 kW.
- ConnectorsCCS2, Type 2 AC
- Charge points2
- Rated output60 kW
Where Thunder Plus Charging Station is
934P+937, Govind Vihar, Danda Dhoran, Danda Nooriwala, Uttarakhand 248013, India
| Field | Value |
|---|---|
| City | Dehradun |
| State | Uttarakhand |
| Coordinates | 30.35591, 78.08519 |
| From Dehradun centre | 6.7 km north-east |
Connectors and power at Thunder Plus Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Thunder Plus Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around Thunder Plus Charging Station
9 other charging locations are mapped within 5 km of Thunder Plus Charging Station, 6 of them with DC fast charging.
Thunder Plus Charging Station is one of 32 charging locations Zevvy has mapped in Dehradun, and one of 27 with DC fast charging. 1 location in Dehradun has a higher recorded output than its 60 kW.
Which cars can charge at Thunder Plus Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Thunder Plus Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Thunder Plus Charging Station
- Reliable Charge Charging Station2nd & 3rd Floor, 412/28/114, Canal Rd, Jakhan, Dehradun, Uttarakhand 248001, India1.4 km away · west
- Tata Power Charging StationB1, Pacific mall, Rajpur Rd, Malsi, Dehradun, Uttarakhand 248009, India1.8 km away · north-west
- Tata Power Charging StationSpree hotel kriday, plot no. 1,lane no. 3, Rajpur Rd, Doon Vihar, Jakhan, Dehradun, Uttarakhand 248001, India1.9 km away · north-west
- Tata Power Charging StationPargana Pachawadoon, Diversion Road, near Max Hospital, Mauza, Malsi, Mussoorie, Dehradun, Uttarakhand 248009, India2.3 km away · north
- ChargeZone Charging Stationnearby Fairfield by Marriott Hotel, Mauza, Malsi, Dehradun, Uttarakhand 248009, India2.5 km away · north
Plan a trip through Dehradun
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Thunder Plus Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Thunder Plus Charging Station have?
- CCS2 (DC fast) and Type 2 AC (AC) across 2 charge points, rated up to 60 kW.
- Is Thunder Plus Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at Thunder Plus Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Thunder Plus Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Thunder Plus Charging Station?
- Any car with CCS2 and Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Thunder Plus Charging Station?
- Reliable Charge Charging Station, 1.4 km away, with Type 2 AC. 4 further alternatives are listed on this page.
