Powerbank Charging Station, Kirti Nagar, Delhi
Powerbank Charging Station is an EV charging location at Kirti Nagar, Delhi, with Type 2 AC and CCS2 across 3 charge points rated up to 50 kW.
- ConnectorsType 2 AC, CCS2
- Charge points3
- Rated output50 kW
Where Powerbank Charging Station is
M542+4PV, Karampura Flyover, Block 1, Kirti Nagar Industrial Area, Kirti Nagar, New Delhi, Delhi, 110008, India
| Field | Value |
|---|---|
| Locality | Kirti Nagar |
| City | Delhi |
| PIN code | 110008 |
| Coordinates | 28.65537, 77.15178 |
| From Delhi centre | 7.2 km north-west |
Connectors and power at Powerbank Charging Station
| Connector | Current | Typical use |
|---|---|---|
| Type 2 AC | AC | Slower top-up over a longer stay |
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Powerbank Charging Station
Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 25 min |
| 45 kWh | 31.5 kWh | 38 min |
| 60 kWh | 42 kWh | 50 min |
Charging around Powerbank Charging Station
36 other charging locations are mapped within 5 km of Powerbank Charging Station, 32 of them with DC fast charging.
Powerbank Charging Station is one of 288 charging locations Zevvy has mapped in Delhi, and one of 197 with DC fast charging. 96 locations in Delhi have a higher recorded output than its 50 kW.
Which cars can charge at Powerbank Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Powerbank Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Powerbank Charging Station
- Tata Power Charging StationM43W+FWW, Block 3, Kirti Nagar Industrial Area, Kirti Nagar, New Delhi, Delhi, 110015, India0.5 km away · south-west
- Electric Vehicle Charging Station31,Shivaji Marg, Moti Nagar, Block A, Block C, Moti Nagar, New Delhi, Delhi, 110015, India0.7 km away · north
- ChargeZone Charging Station7/24, Block 7, Kirti Nagar Industrial Area, Kirti Nagar, Delhi, 110015, India0.8 km away · south-west
- Electric Vehicle Charging StationKarampura Commercial Complex, Veer Kunwar Singh Marg, Karampura Market, Karam Pura, Delhi, 110015, India0.9 km away · north-west
- Tata Power Charging Station25/1/1, Shivaji Marg, Block C, Najafgarh Road Industrial Area, New Delhi, Delhi, 110015, India1.0 km away · north-east
Plan a trip through Delhi
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Powerbank Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Powerbank Charging Station have?
- Type 2 AC (AC) and CCS2 (DC fast) across 3 charge points, rated up to 50 kW.
- Is Powerbank Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 50 kW.
- How long does it take to charge at Powerbank Charging Station?
- At its rated 50 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 38 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Powerbank Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Powerbank Charging Station?
- Any car with Type 2 AC and CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Powerbank Charging Station?
- Tata Power Charging Station, 0.5 km away, with CCS2. 4 further alternatives are listed on this page.
