E-Drive Charging Station, Garhani, Deodhi
E-Drive Charging Station is an EV charging location at Garhani, Deodhi, Bihar, with CCS2 across 1 charge point rated up to 30 kW.
- ConnectorsCCS2
- Charge points1
- Rated output30 kW
Where E-Drive Charging Station is
Arrah - Sasaram Rd, Garhani, Deodhi, Bihar 802203, India
| Field | Value |
|---|---|
| Locality | Garhani |
| City | Deodhi |
| State | Bihar |
| Coordinates | 25.40424, 84.54870 |
Connectors and power at E-Drive Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at E-Drive Charging Station
Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 42 min |
| 45 kWh | 31.5 kWh | 1 hr 5 min |
| 60 kWh | 42 kWh | 1 hr 25 min |
Charging around E-Drive Charging Station
1 other charging location is mapped within 5 km of E-Drive Charging Station, 1 of them with DC fast charging.
It is the only charging location Zevvy has mapped in Deodhi.
Which cars can charge at E-Drive Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for E-Drive Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to E-Drive Charging Station
- BPCL Charging StationCH3G+74H, Dhandhauli, Pararia, Bihar 802203, India2.7 km away · east
- BPCL Charging StationFCHH+MMM, Naya Tola, Parasiya, Jagdishpur, Bihar 802158, India14.6 km away · north-west
Plan a trip through Deodhi
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is E-Drive Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does E-Drive Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 30 kW.
- Is E-Drive Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 30 kW.
- How long does it take to charge at E-Drive Charging Station?
- At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at E-Drive Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at E-Drive Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to E-Drive Charging Station?
- BPCL Charging Station, 2.7 km away, with CCS2. 1 further alternative is listed on this page.
