Zevvy Plan a route

Adams Butzel Complex EV Charging Station, 10500 Lyndon St, Detroit, MI

Adams Butzel Complex is a EV Connect charging location at 10500 Lyndon St, Detroit, Michigan, with CCS1 across 1 charge point rated up to 50 kW.

Where Adams Butzel Complex is

10500 Lyndon St, Detroit, MI, 48238

Location detail for Adams Butzel Complex
FieldValue
Street10500 Lyndon St
CityDetroit
StateMichigan
Coordinates42.39714, -83.16691
Network operatorEV Connect

Connectors and power at Adams Butzel Complex

Connector types recorded at Adams Butzel Complex
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Adams Butzel Complex

Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Adams Butzel Complex
Battery sizeEnergy addedMinimum time
60 kWh42 kWh50 min
80 kWh56 kWh1 hr 5 min
100 kWh70 kWh1 hr 25 min

Charging around Adams Butzel Complex

18 other charging locations are mapped within 3 mi of Adams Butzel Complex, 2 of them with DC fast charging.

Adams Butzel Complex is one of 137 charging locations Zevvy has mapped in Detroit, and one of 23 with DC fast charging. 18 locations in Detroit have a higher recorded output than its 50 kW.

Which cars can charge at Adams Butzel Complex

Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Adams Butzel Complex, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Adams Butzel Complex

Plan a trip through Detroit

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Adams Butzel Complex working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Adams Butzel Complex have?
CCS1 (DC fast) across 1 charge point, rated up to 50 kW.
Is Adams Butzel Complex a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 50 kW.
How long does it take to charge at Adams Butzel Complex?
At its rated 50 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Adams Butzel Complex?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. EV Connect sets the tariff at this site; check their app or the unit before plugging in.
Which cars can charge at Adams Butzel Complex?
Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Adams Butzel Complex?
EV Connect Charging Station, 0.1 mi away, with CCS1. 4 further alternatives are listed on this page.

More charging near Adams Butzel Complex