BESCOM Charging Station, Ramanagara, Doddamannugudde Forest
BESCOM Charging Station is an EV charging location at Ramanagara, Doddamannugudde Forest, Karnataka, with CCS2 across 3 charge points rated up to 25 kW.
- ConnectorsCCS2
- Charge points3
- Rated output25 kW
Where BESCOM Charging Station is
BESCOM Training & Research Institute, Ramanagara, Doddamannugudde Forest, Karnataka 562159, India
| Field | Value |
|---|---|
| Locality | Ramanagara |
| City | Doddamannugudde Forest |
| State | Karnataka |
| Coordinates | 12.70667, 77.25271 |
Connectors and power at BESCOM Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 25 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at BESCOM Charging Station
Time to take a battery from 10 to 80 per cent at the 25 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 25 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 50 min |
| 45 kWh | 31.5 kWh | 1 hr 15 min |
| 60 kWh | 42 kWh | 1 hr 40 min |
Charging around BESCOM Charging Station
2 other charging locations are mapped within 5 km of BESCOM Charging Station, 2 of them with DC fast charging.
It is the only charging location Zevvy has mapped in Doddamannugudde Forest.
Which cars can charge at BESCOM Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for BESCOM Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to BESCOM Charging Station
- Hindustan Petroleum Corporation Limited Charging StationP757+2VX, Archikarahalli, Ramanagara, Archakarahalli, Karnataka 562159, India1.3 km away · east
- Suzuki Motorcycle Charging Station1911/38/01, Vivekananda Nagar Rd, SH17, Ramanagara, Karnataka 562159, India3.5 km away · north-east
- BESCOM Charging StationM642+2PW, MG Rd, Channapattana, Karnataka 562160, India8.0 km away · south-west
- Hindustan Petroleum Corporation Limited Charging StationJ5XQ+953, Mysore Rd, Channapattana, Karnataka 562160, India9.6 km away · south-west
- BPCL Charging StationKanva Filling Station, Ramanagara, NH-275, Mysore Road, Chennapattana, Chennapattana, Karnataka 562160 Ramanagaram, Thittamaranahalli, Doddamallur, Karnataka 560026, India10.0 km away · south-west
Plan a trip through Doddamannugudde Forest
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is BESCOM Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does BESCOM Charging Station have?
- CCS2 (DC fast) across 3 charge points, rated up to 25 kW.
- Is BESCOM Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 25 kW.
- How long does it take to charge at BESCOM Charging Station?
- At its rated 25 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 15 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at BESCOM Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at BESCOM Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to BESCOM Charging Station?
- Hindustan Petroleum Corporation Limited Charging Station, 1.3 km away, with CCS2. 4 further alternatives are listed on this page.
