Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey EV Charging Station, 1945, Avenue Parkfield, Dorval, QC
Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey is a Circuit Electrique charging location at 1945, Avenue Parkfield, Dorval, Quebec, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
- NetworkCircuit Electrique
Where Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey is
1945, Avenue Parkfield, Dorval, QC, H9P 1T9
| Field | Value |
|---|---|
| Street | 1945, Avenue Parkfield |
| City | Dorval |
| Province | Quebec |
| Coordinates | 45.45357, -73.77290 |
| Network operator | Circuit Electrique |
Connectors and power at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey
54 other charging locations are mapped within 5 km of Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey, 7 of them with DC fast charging. Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey has no DC fast charging recorded; the closest location that does is EcoCharge, 2.2 km east.
Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey is one of 28 charging locations Zevvy has mapped in Dorval; 2 of them have DC fast charging. 3 locations in Dorval have a higher recorded output than its 3.7 kW.
Which cars can charge at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey
- Circuit électrique Charging Station1945 Av. Parkfield, Dorval, QC H9P 1T9, Canada0.1 km away · east
- CE-P4-2-YUL570, boul. Albert de Niverville, Dorval, QC, H4Y 1J31.3 km away · east
- Circuit électrique Charging Station570 Bd Albert de Niverville, Dorval, QC H4Y 1K5, Canada1.4 km away · east
- Aéroports de Montréal570 Albert-De-Niverville Blvd, Dorval, QC, H4Y 1G51.6 km away · east
- FLO Charging Station1856 Bd des Sources, Pointe-Claire, QC H9R 5B1, Canada1.6 km away · north-west
Plan a trip through Dorval
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey a fast charger?
- No. Only AC charging is recorded at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is EcoCharge, 2.2 km away.
- How long does it take to charge at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Circuit Electrique sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Cité de Dorval - Stationnement du centre aquatique et communautaire Surrey?
- Circuit électrique Charging Station, 0.1 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.
