Zevvy Plan a route

ChargePoint Charging Station, 6754 Washington Ave, Egg Harbor Township, NJ

ChargePoint Charging Station is an EV charging location at 6754 Washington Ave, Egg Harbor Township, New Jersey, with CCS1 and CHAdeMO across 2 charge points rated up to 62.5 kW.

Where ChargePoint Charging Station is

6754 Washington Ave, Egg Harbor Township, NJ 08234, USA

Location detail for ChargePoint Charging Station
FieldValue
Street6754 Washington Ave
CityEgg Harbor Township
StateNew Jersey
ZIP code08234
Coordinates39.40439, -74.55393

Connectors and power at ChargePoint Charging Station

Connector types recorded at ChargePoint Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop
CHAdeMODCFast charging on a highway stop

The highest output recorded for this location is 62.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

Which cars can charge at ChargePoint Charging Station

Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Reported status and reviews

Zevvy records no independently verified working status for any charger in this dataset, and does not publish one it cannot stand behind. Google users rate ChargePoint Charging Station 3.9 out of 5 from 28 reviews.

What drivers have written

“Located in the behind of a building. Very industrial. 1 charger (2 types cords). Nothing nearby other than the brewery and it was closed when I was there. Took 40 minutes from 60% to 80% on Chevy Equinox EV. Not very fast. I would avoid this charger if there are other choices.” — Kimiyasu Mizoo, a year ago

“Located in the back of the Hidden Sands Brewing Company. Pretty nice spot only 2 chargers though. Never had a problem charging here. The chargers take about 30 minutes to 80% depending on how low you are. If they put more chargers here it would be great, bc one time 3 cars showed up to charge at the same time and they had to wait.” — Gillis Da Kid, 4 years ago

“Location in the back of Greenleaf building. One charger with CCS and CHAdeMO adapter. Best kW was ~52.” — Joseph Goss, 10 months ago

Nearest alternative chargers to ChargePoint Charging Station

Plan a trip through Egg Harbor Township

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is ChargePoint Charging Station working right now?
Zevvy does not hold a verified live status for this charger, so we do not claim one. Google users rate it 3.9 out of 5 from 28 reviews, which is a signal about the site rather than about the bay being free today. Check the live planner before you rely on it, and see the alternatives listed on this page.
What connectors does ChargePoint Charging Station have?
CCS1 (DC fast) and CHAdeMO (DC fast) across 2 charge points, rated up to 62.5 kW.
How much does it cost to charge at ChargePoint Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at ChargePoint Charging Station?
Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to ChargePoint Charging Station?
ChargePoint Charging Station, 0.3 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near ChargePoint Charging Station