E Fill Electric Charging Station, Sector 28, Faridabad
E Fill Electric Charging Station is an EV charging location at Sector 28, Faridabad, Haryana, with CCS2 across 1 charge point rated up to 60 kW.
- ConnectorsCCS2
- Charge points1
- Rated output60 kW
Where E Fill Electric Charging Station is
2117, NH-19, Rajendra Colony, Sector 28, Faridabad, Haryana 121008, India
| Field | Value |
|---|---|
| Locality | Sector 28 |
| City | Faridabad |
| State | Haryana |
| Coordinates | 28.43406, 77.30961 |
| From Faridabad centre | 2.9 km north |
Connectors and power at E Fill Electric Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at E Fill Electric Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around E Fill Electric Charging Station
14 other charging locations are mapped within 5 km of E Fill Electric Charging Station, 10 of them with DC fast charging.
E Fill Electric Charging Station is one of 39 charging locations Zevvy has mapped in Faridabad, and one of 33 with DC fast charging. 3 locations in Faridabad have a higher recorded output than its 60 kW.
Which cars can charge at E Fill Electric Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for E Fill Electric Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to E Fill Electric Charging Station
- E-Fill Charging StationC8M4+VV6, Mathura Rd, Part II, Sector 27/A, Faridabad, Haryana 121003, India0.2 km away · west
- Mercedes-Benz High-Power Charging StationC8J5+QFC Mercedes-Benz T&T Motors, पार्त II, सेक्टर 27 / A, फरीदाबाद, हरियाणा 121003, India0.3 km away · south
- BPCL Charging StationC8R5+V5M, HBH Colony, Sector 27/A, Faridabad, Haryana 121003, India0.9 km away · north
- BMW Charging Station6, Mathura Rd, Pocket B, Sector 27, Faridabad, Haryana 121003, India1.3 km away · north
- GLIDA Charging StationNo 14/3, NH-19, Pocket B, Sector 27, Faridabad, Haryana 121003, India1.3 km away · north
Plan a trip through Faridabad
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is E Fill Electric Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does E Fill Electric Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 60 kW.
- Is E Fill Electric Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at E Fill Electric Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at E Fill Electric Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at E Fill Electric Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to E Fill Electric Charging Station?
- E-Fill Charging Station, 0.2 km away, with CCS2. 4 further alternatives are listed on this page.
