Adani Charging Station, Multilevel Car Parking P1, Greater Noida, Ghaziabad
Adani Charging Station is an EV charging location at Greater Noida, Ghaziabad, Uttar Pradesh, with CCS2 and Type 2 AC across 2 charge points rated up to 60 kW.
- ConnectorsCCS2, Type 2 AC
- Charge points2
- Rated output60 kW
Where Adani Charging Station is
Multilevel Car Parking P1, GH-01, Greater Noida W Rd, Gaur City 1, Sector-04, West, Greater Noida, Ghaziabad, Uttar Pradesh 201016, India
| Field | Value |
|---|---|
| Locality | Greater Noida |
| City | Ghaziabad |
| State | Uttar Pradesh |
| Coordinates | 28.61497, 77.42782 |
| From Ghaziabad centre | 6.5 km south-west |
Connectors and power at Adani Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Adani Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around Adani Charging Station
13 other charging locations are mapped within 5 km of Adani Charging Station, 10 of them with DC fast charging.
Adani Charging Station is one of 39 charging locations Zevvy has mapped in Ghaziabad, and one of 29 with DC fast charging. No location in Ghaziabad has a higher recorded output than its 60 kW.
Which cars can charge at Adani Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Adani Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Adani Charging Station
- Adani Charging StationMall Multilevel Car Parking P3, GH-01, Greater Noida W Rd, Gaur City 1, Sector-04, West, Greater Noida, Ghaziabad, Uttar Pradesh 201318, India1.0 km away · south
- Sonik Mobility Charging StationSupertech Eco Village 2 Tower B-9, SUPERTECH ECO VILLAGE-2, Bhangel, Eco Village 2, Greater Noida, Ghaziabad, Uttar Pradesh 201318, India1.3 km away · east
- EVRE Charging Station2, Crossings Republik, Noida, Ghaziabad, Uttar Pradesh 201016, India1.9 km away · north-east
- Chargze Charging StationJC72+VPH, Bahlolpur, Noida, Uttar Pradesh 201309, India2.5 km away · west
- Chargze Charging StationJC62+Q9G, Bahlolpur, Noida, Yusufpur Chak Saberi, Uttar Pradesh 201309, India2.6 km away · west
Plan a trip through Ghaziabad
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Adani Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Adani Charging Station have?
- CCS2 (DC fast) and Type 2 AC (AC) across 2 charge points, rated up to 60 kW.
- Is Adani Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at Adani Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Adani Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Adani Charging Station?
- Any car with CCS2 and Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Adani Charging Station?
- Adani Charging Station, 1.0 km away, with Type 2 AC and CCS2. 4 further alternatives are listed on this page.
