Tata Charging Station, Ghaziabad
Tata Charging Station is an EV charging location at Ghaziabad, Uttar Pradesh, with CCS2 across 1 charge point rated up to 25 kW.
- ConnectorsCCS2
- Charge points1
- Rated output25 kW
Where Tata Charging Station is
J9FJ+4JC, in front of marie gold exports ltd, A Block, Sector 63, Noida, Uttar Pradesh 201309, India
| Field | Value |
|---|---|
| City | Ghaziabad |
| State | Uttar Pradesh |
| Coordinates | 28.62281, 77.38152 |
| From Ghaziabad centre | 8.7 km south-west |
Connectors and power at Tata Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 25 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Tata Charging Station
Time to take a battery from 10 to 80 per cent at the 25 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 25 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 50 min |
| 45 kWh | 31.5 kWh | 1 hr 15 min |
| 60 kWh | 42 kWh | 1 hr 40 min |
Charging around Tata Charging Station
21 other charging locations are mapped within 5 km of Tata Charging Station, 16 of them with DC fast charging.
Tata Charging Station is one of 39 charging locations Zevvy has mapped in Ghaziabad, and one of 29 with DC fast charging. 24 locations in Ghaziabad have a higher recorded output than its 25 kW.
Which cars can charge at Tata Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Tata Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Tata Charging Station
- Chargze Charging StationJ9CJ+98G, A Block, Sector 63, Noida, Uttar Pradesh 201309, India0.2 km away · south
- Tata Power Charging StationJ9GG+74W Ginger Hotel, H Block, Sector 63, Noida, Uttar Pradesh 201309, India0.7 km away · north-west
- Delta Charging StationJ9GG+J3Q, H Block, Sector 63, Noida, Uttar Pradesh 201309, India0.7 km away · north-west
- BMW Charging StationH/8, H Block, सेक्टर ६३, नोएडा, उत्तर प्रदेश 201309, India0.9 km away · north
- Chargze Charging StationJ9H7+6VM, Block A, Industrial Area, Sector 62, Noida, Uttar Pradesh 201309, India1.7 km away · west
Plan a trip through Ghaziabad
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Tata Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Tata Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 25 kW.
- Is Tata Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 25 kW.
- How long does it take to charge at Tata Charging Station?
- At its rated 25 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 15 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Tata Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Tata Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Tata Charging Station?
- Chargze Charging Station, 0.2 km away, with Type 2 AC. 4 further alternatives are listed on this page.
