Zevvy Plan a route

Renewable Grid - Glen Cove Fast Charging, 41 Forest Ave, Glen Cove, NY

Renewable Grid - Glen Cove Fast Charging is an EV charging location at 41 Forest Ave, Glen Cove, New York, with CCS1 across 1 charge point rated up to 192 kW.

Where Renewable Grid - Glen Cove Fast Charging is

41 Forest Ave, Glen Cove, NY, 11542

Location detail for Renewable Grid - Glen Cove Fast Charging
FieldValue
Street41 Forest Ave
CityGlen Cove
StateNew York
Coordinates40.86583, -73.63155

Connectors and power at Renewable Grid - Glen Cove Fast Charging

Connector types recorded at Renewable Grid - Glen Cove Fast Charging
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 192 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Renewable Grid - Glen Cove Fast Charging

Time to take a battery from 10 to 80 per cent at the 192 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 192 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Renewable Grid - Glen Cove Fast Charging
Battery sizeEnergy addedMinimum time
60 kWh42 kWh13 min
80 kWh56 kWh18 min
100 kWh70 kWh22 min

Charging around Renewable Grid - Glen Cove Fast Charging

8 other charging locations are mapped within 3 mi of Renewable Grid - Glen Cove Fast Charging, 2 of them with DC fast charging.

Renewable Grid - Glen Cove Fast Charging is one of 6 charging locations Zevvy has mapped in Glen Cove, and one of 3 with DC fast charging. No location in Glen Cove has a higher recorded output than its 192 kW.

Which cars can charge at Renewable Grid - Glen Cove Fast Charging

Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Renewable Grid - Glen Cove Fast Charging, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Renewable Grid - Glen Cove Fast Charging

Plan a trip through Glen Cove

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Renewable Grid - Glen Cove Fast Charging working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Renewable Grid - Glen Cove Fast Charging have?
CCS1 (DC fast) across 1 charge point, rated up to 192 kW.
Is Renewable Grid - Glen Cove Fast Charging a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 192 kW.
How long does it take to charge at Renewable Grid - Glen Cove Fast Charging?
At its rated 192 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 18 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Renewable Grid - Glen Cove Fast Charging?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Renewable Grid - Glen Cove Fast Charging?
Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Renewable Grid - Glen Cove Fast Charging?
ChargePoint Charging Station, 0.0 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near Renewable Grid - Glen Cove Fast Charging