MobiLane Charging Station, Dhordo, Gorewali
MobiLane Charging Station is an EV charging location at Dhordo, Gorewali, Gujarat, with CCS2 and Type 2 AC across 3 charge points rated up to 80 kW.
- ConnectorsCCS2, Type 2 AC
- Charge points3
- Rated output80 kW
Where MobiLane Charging Station is
Rann Utsav Road, Hodka, Dhordo, Gorewali, Gujarat 370510, India
| Field | Value |
|---|---|
| Locality | Dhordo |
| City | Gorewali |
| State | Gujarat |
| Coordinates | 23.80624, 69.50967 |
Connectors and power at MobiLane Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 80 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at MobiLane Charging Station
Time to take a battery from 10 to 80 per cent at the 80 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 80 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 16 min |
| 45 kWh | 31.5 kWh | 24 min |
| 60 kWh | 42 kWh | 32 min |
Charging around MobiLane Charging Station
No other charging location is mapped within 5 km of MobiLane Charging Station, so it is worth checking before you depend on it.
It is the only charging location Zevvy has mapped in Gorewali.
Which cars can charge at MobiLane Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for MobiLane Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Plan a trip through Gorewali
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is MobiLane Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does MobiLane Charging Station have?
- CCS2 (DC fast) and Type 2 AC (AC) across 3 charge points, rated up to 80 kW.
- Is MobiLane Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 80 kW.
- How long does it take to charge at MobiLane Charging Station?
- At its rated 80 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 24 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at MobiLane Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at MobiLane Charging Station?
- Any car with CCS2 and Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
