E-Fill Electric Charging Station, Omicron I, Greater Noida
E-Fill Electric Charging Station is an EV charging location at Omicron I, Greater Noida, Uttar Pradesh, with Type 2 AC and CCS2 across 3 charge points rated up to 60 kW.
- ConnectorsType 2 AC, CCS2
- Charge points3
- Rated output60 kW
Where E-Fill Electric Charging Station is
FH65+MCW, Omicron I, Greater Noida, Uttar Pradesh 201310, India
| Field | Value |
|---|---|
| Locality | Omicron I |
| City | Greater Noida |
| State | Uttar Pradesh |
| Coordinates | 28.46173, 77.55858 |
Connectors and power at E-Fill Electric Charging Station
| Connector | Current | Typical use |
|---|---|---|
| Type 2 AC | AC | Slower top-up over a longer stay |
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at E-Fill Electric Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around E-Fill Electric Charging Station
7 other charging locations are mapped within 5 km of E-Fill Electric Charging Station, 6 of them with DC fast charging.
E-Fill Electric Charging Station is one of 6 charging locations Zevvy has mapped in Greater Noida, and one of 5 with DC fast charging. No location in Greater Noida has a higher recorded output than its 60 kW.
Which cars can charge at E-Fill Electric Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for E-Fill Electric Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to E-Fill Electric Charging Station
- Statiq Charging StationFGGW+MHC, Unitech City, Unitech Horizon, Pi I & II, Greater Noida, Uttar Pradesh 201310, India2.0 km away · north-west
- Tata Power Charging StationFG5F+56G, P3 Gol Chakkar, Block A, Industrial Area, Sector Swarn Nagri, Greater Noida, Uttar Pradesh 201315, India3.5 km away · west
- E-Fill Charging StationTower-3, Sa Court Tower-3, Sa Court, Block B, Jaypee Greens, Greater Noida, Uttar Pradesh 201315, India4.0 km away · west
- Omaxe India Trade CentreBlock I, Sector Alpha II, Noida, Uttar Pradesh, 2013084.1 km away · north-west
- HPeCharge Charging StationEta II, Rasoolpur Rai, Uttar Pradesh 201310, India4.1 km away · north-west
Plan a trip through Greater Noida
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is E-Fill Electric Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does E-Fill Electric Charging Station have?
- Type 2 AC (AC) and CCS2 (DC fast) across 3 charge points, rated up to 60 kW.
- Is E-Fill Electric Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at E-Fill Electric Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at E-Fill Electric Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at E-Fill Electric Charging Station?
- Any car with Type 2 AC and CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to E-Fill Electric Charging Station?
- Statiq Charging Station, 2.0 km away, with Type 2 AC. 4 further alternatives are listed on this page.
