GLIDA Charging Station, Baliawas, Gurugram
GLIDA Charging Station is an EV charging location at Baliawas, Gurugram, Haryana, with CCS2 across 1 charge point rated up to 50 kW.
- ConnectorsCCS2
- Charge points1
- Rated output50 kW
Where GLIDA Charging Station is
C594+GX HPCL BST Petro Mart On, Faridabad - Gurgaon Rd, Baliawas, Gurugram, Bandhwari, Haryana 122003, India
| Field | Value |
|---|---|
| Locality | Baliawas |
| City | Gurugram |
| State | Haryana |
| Coordinates | 28.41893, 77.15727 |
| From Gurugram centre | 13.5 km east |
Connectors and power at GLIDA Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at GLIDA Charging Station
Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 25 min |
| 45 kWh | 31.5 kWh | 38 min |
| 60 kWh | 42 kWh | 50 min |
Charging around GLIDA Charging Station
7 other charging locations are mapped within 5 km of GLIDA Charging Station, 4 of them with DC fast charging.
GLIDA Charging Station is one of 177 charging locations Zevvy has mapped in Gurugram, and one of 135 with DC fast charging. 87 locations in Gurugram have a higher recorded output than its 50 kW.
Which cars can charge at GLIDA Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for GLIDA Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to GLIDA Charging Station
- Statiq Charging StationC594+HWM Chaar Bhai Dhaba Gwal Pahari, Faridabad - Gurgaon Rd, Gwal Pahari, Gurugram, Bandhwari, Haryana 122003, India0.0 km away · north-east
- BPCL Charging StationC4FW+RVQ, Baliawas, Gurugram, Bandhwari, Haryana 122101, India1.2 km away · north-west
- BMW Destination Charging StationGwal Pahari, Bandhwari, Haryana 122003, India2.0 km away · north-west
- Tata Power Charging StationKhewat, No, Mikado Realtors Private Limited Electronic, Hardware IT/ITES – SEZ, 221/274, Road Tehsil, near 59 Golf Cource Extn, Behrampur Village, Sohna, Gurugram, Haryana 122011, India4.0 km away · west
- BMW Destination Charging StationGolf Course Extension Rd, Gurgaon, Gurugram, Ghata, Haryana 122001, Sector 58, Gurugram, Haryana 122011, India4.4 km away · west
Plan a trip through Gurugram
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is GLIDA Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does GLIDA Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 50 kW.
- Is GLIDA Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 50 kW.
- How long does it take to charge at GLIDA Charging Station?
- At its rated 50 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 38 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at GLIDA Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at GLIDA Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to GLIDA Charging Station?
- Statiq Charging Station, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.
