ChargePoint Charging Station, 124 N High St, Hillsboro, OH
ChargePoint Charging Station is an EV charging location at 124 N High St, Hillsboro, Ohio, with CHAdeMO and CCS1 across 2 charge points rated up to 62.5 kW.
- ConnectorsCHAdeMO, CCS1
- Charge points2
- Rated output62.5 kW
Where ChargePoint Charging Station is
124 N High St, Hillsboro, OH 45133, USA
| Field | Value |
|---|---|
| Street | 124 N High St |
| City | Hillsboro |
| State | Ohio |
| ZIP code | 45133 |
| Coordinates | 39.20298, -83.61084 |
Connectors and power at ChargePoint Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CHAdeMO | DC | Fast charging on a highway stop |
| CCS1 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 62.5 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at ChargePoint Charging Station
Time to take a battery from 10 to 80 per cent at the 62.5 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 62.5 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 40 min |
| 80 kWh | 56 kWh | 54 min |
| 100 kWh | 70 kWh | 1 hr 5 min |
Charging around ChargePoint Charging Station
No other charging location is mapped within 3 mi of ChargePoint Charging Station, so it is worth checking before you depend on it.
It is the only charging location Zevvy has mapped in Hillsboro.
Which cars can charge at ChargePoint Charging Station
Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for ChargePoint Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Plan a trip through Hillsboro
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is ChargePoint Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does ChargePoint Charging Station have?
- CHAdeMO (DC fast) and CCS1 (DC fast) across 2 charge points, rated up to 62.5 kW.
- Is ChargePoint Charging Station a fast charger?
- Yes. It has DC fast charging (CHAdeMO and CCS1), rated up to 62.5 kW.
- How long does it take to charge at ChargePoint Charging Station?
- At its rated 62.5 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 54 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at ChargePoint Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at ChargePoint Charging Station?
- Any car with a CHAdeMO and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.