Zevvy Plan a route

Executive Construction EV Charging Station, 235 Fencl Ln, Hillside, IL

Executive Construction is a AmpUp charging location at 235 Fencl Ln, Hillside, Illinois, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.

Where Executive Construction is

235 Fencl Ln, Hillside, IL, 60162

Location detail for Executive Construction
FieldValue
Street235 Fencl Ln
CityHillside
StateIllinois
Coordinates41.86577, -87.89482
Network operatorAmpUp

Connectors and power at Executive Construction

Connector types recorded at Executive Construction
ConnectorCurrentTypical use
J1772 (Type 1)ACSlower top-up over a longer stay

The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Executive Construction

Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Executive Construction
Battery sizeEnergy addedMinimum time
60 kWh42 kWh11 hr 20 min
80 kWh56 kWh15 hr 10 min
100 kWh70 kWh18 hr 55 min

Charging around Executive Construction

14 other charging locations are mapped within 3 mi of Executive Construction, 9 of them with DC fast charging. Executive Construction has no DC fast charging recorded; the closest location that does is XeV Ultra Fast Charging Station, 1.1 mi north-east.

Executive Construction is one of 2 charging locations Zevvy has mapped in Hillside; 1 of them has DC fast charging. 1 location in Hillside has a higher recorded output than its 3.7 kW.

Which cars can charge at Executive Construction

Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Executive Construction, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Executive Construction

Plan a trip through Hillside

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Executive Construction working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Executive Construction have?
J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
Is Executive Construction a fast charger?
No. Only AC charging is recorded at Executive Construction, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is XeV Ultra Fast Charging Station, 1.1 mi away.
How long does it take to charge at Executive Construction?
At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at Executive Construction?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. AmpUp sets the tariff at this site; check their app or the unit before plugging in.
Which cars can charge at Executive Construction?
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
What is the nearest alternative to Executive Construction?
XeV Ultra Fast Charging Station, 1.1 mi away, with CCS1. 4 further alternatives are listed on this page.

More charging near Executive Construction