Electric Vehicle Charging Station, Industrial Estate, Hyderabad
Electric Vehicle Charging Station is an EV charging location at Industrial Estate, Hyderabad, Telangana, with Type 2 AC and CCS2 across 2 charge points rated up to 30 kW.
- ConnectorsType 2 AC, CCS2
- Charge points2
- Rated output30 kW
Where Electric Vehicle Charging Station is
2ed Floor, Common Facility Building, Sy.No.342, ALEAP Industrial Area, Industrial Estate, Hyderabad, Telangana 500090, India
| Field | Value |
|---|---|
| Locality | Industrial Estate |
| City | Hyderabad |
| State | Telangana |
| Coordinates | 17.52904, 78.39720 |
| From Hyderabad centre | 18.6 km north-west |
Connectors and power at Electric Vehicle Charging Station
| Connector | Current | Typical use |
|---|---|---|
| Type 2 AC | AC | Slower top-up over a longer stay |
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Electric Vehicle Charging Station
Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 42 min |
| 45 kWh | 31.5 kWh | 1 hr 5 min |
| 60 kWh | 42 kWh | 1 hr 25 min |
Charging around Electric Vehicle Charging Station
10 other charging locations are mapped within 5 km of Electric Vehicle Charging Station, 9 of them with DC fast charging.
Electric Vehicle Charging Station is one of 227 charging locations Zevvy has mapped in Hyderabad, and one of 192 with DC fast charging. 105 locations in Hyderabad have a higher recorded output than its 30 kW.
Which cars can charge at Electric Vehicle Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Electric Vehicle Charging Station
- Bharat Chargeopp. Captain Lakhsmi Sahgal Park, Kakatiya Hills, Pragathi Nagar, Nizampet, Hyderabad, Telangana 500090, India0.9 km away · north-west
- Hindustan Petroleum Corporation Limited Charging StationGCG8+RRV, Samskruthi Avenues Rd., Mahadevpur Colony, Hyderabad, Telangana 500117, India2.1 km away · east
- Tata Power Charging StationG99J+2C2, Hi-Rise Colony, Vasanth Nagar Colony, Nizampet, Hyderabad, Telangana 500090, India2.1 km away · south-west
- ThunderPlus Charging StationG9WQ+G5F, Bachupally, Hyderabad, Telangana 500118, India2.2 km away · north-west
- chargeMOD Charging StationBlack diamond enclave, PLOT NO 49/PART, Bachupally, Hyderabad, Telangana 500118, India3.4 km away · north-west
Plan a trip through Hyderabad
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Electric Vehicle Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Electric Vehicle Charging Station have?
- Type 2 AC (AC) and CCS2 (DC fast) across 2 charge points, rated up to 30 kW.
- Is Electric Vehicle Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 30 kW.
- How long does it take to charge at Electric Vehicle Charging Station?
- At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Electric Vehicle Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Electric Vehicle Charging Station?
- Any car with Type 2 AC and CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Electric Vehicle Charging Station?
- Bharat Charge, 0.9 km away, with CCS2. 4 further alternatives are listed on this page.
