Zevvy Plan a route

The Moorings Village EV Charging Station, 123 Beach Rd, Islamorada, FL

The Moorings Village is an EV charging location at 123 Beach Rd, Islamorada, Florida, with NACS (Tesla) across 1 charge point rated up to 16 kW.

Where The Moorings Village is

123 Beach Rd, Islamorada, FL 33036, USA

Location detail for The Moorings Village
FieldValue
Street123 Beach Rd
CityIslamorada
StateFlorida
ZIP code33036
Coordinates24.91480, -80.63617

Connectors and power at The Moorings Village

Connector types recorded at The Moorings Village
ConnectorCurrentTypical use
NACS (Tesla)ACSlower top-up over a longer stay

The highest output recorded for this location is 16 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at The Moorings Village

Time to take a battery from 10 to 80 per cent at the 16 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 16 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at The Moorings Village
Battery sizeEnergy addedMinimum time
60 kWh42 kWh2 hr 40 min
80 kWh56 kWh3 hr 30 min
100 kWh70 kWh4 hr 25 min

Charging around The Moorings Village

5 other charging locations are mapped within 3 mi of The Moorings Village, none of them with DC fast charging. The Moorings Village has no DC fast charging recorded, and no location with it is mapped within 16 mi.

The Moorings Village is one of 6 charging locations Zevvy has mapped in Islamorada; none of them have DC fast charging. No location in Islamorada has a higher recorded output than its 16 kW.

Which cars can charge at The Moorings Village

Any car with a NACS (Tesla) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for The Moorings Village, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to The Moorings Village

Plan a trip through Islamorada

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is The Moorings Village working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does The Moorings Village have?
NACS (Tesla) (AC) across 1 charge point, rated up to 16 kW.
Is The Moorings Village a fast charger?
No. Only AC charging is recorded at The Moorings Village, which suits a longer stay rather than a quick highway stop. No DC fast charger is mapped within 16 mi.
How long does it take to charge at The Moorings Village?
At its rated 16 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 3 hr 30 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at The Moorings Village?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at The Moorings Village?
Any car with a NACS (Tesla) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
What is the nearest alternative to The Moorings Village?
Tesla Destination Charger, 0.2 mi away, with NACS (Tesla). 4 further alternatives are listed on this page.

More charging near The Moorings Village