Kia Charging Station, Basni, Jodhpur
Kia Charging Station is an EV charging location at Basni, Jodhpur, Rajasthan, with CCS2 across 1 charge point rated up to 90 kW.
- ConnectorsCCS2
- Charge points1
- Rated output90 kW
Where Kia Charging Station is
Kumbhat Kia, 20/1, near Saras Dairy, Heavy Industrial Area, Basni, Jodhpur, Rajasthan 342001, India
| Field | Value |
|---|---|
| Locality | Basni |
| City | Jodhpur |
| State | Rajasthan |
| Coordinates | 26.25446, 73.00016 |
| From Jodhpur centre | 3.0 km north-west |
Connectors and power at Kia Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 90 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Kia Charging Station
Time to take a battery from 10 to 80 per cent at the 90 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 90 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 14 min |
| 45 kWh | 31.5 kWh | 21 min |
| 60 kWh | 42 kWh | 28 min |
Charging around Kia Charging Station
14 other charging locations are mapped within 5 km of Kia Charging Station, 12 of them with DC fast charging.
Kia Charging Station is one of 33 charging locations Zevvy has mapped in Jodhpur, and one of 28 with DC fast charging. 1 location in Jodhpur has a higher recorded output than its 90 kW.
Which cars can charge at Kia Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Kia Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Kia Charging Station
- Xobolt Charging StationLight Industrial Estate, Plot no. 21, काज़री मार्ग, Near ITI Road, सेक्टर G, शास्त्री नगर, जोधपुर, राजस्थान 342001, India0.8 km away · north
- Tata Power Charging StationT-5, Industrial Estate, New Power House Rd, Section 7 Extension, Shastri Nagar, Jodhpur, Rajasthan 342003, India1.6 km away · north-east
- E Fill Electric Charging Stationplot no 96, opposite 12th Road, Masuria Colony, Baldev Nagar, Jodhpur, Rajasthan 342003, India2.4 km away · north
- Tata Power Charging StationTaj Hari Mahal, 5th, Residency Rd, Surya Colony, Jodhpur, Rajasthan 342001, India2.5 km away · north-east
- Suzuki Motorcycle Charging Station7XHX+CGQ, Bombay Motors Cir, Bombay Motor Circle, Pratap Nagar, Jodhpur, Rajasthan 342003, India2.7 km away · north
Plan a trip through Jodhpur
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Kia Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Kia Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 90 kW.
- Is Kia Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 90 kW.
- How long does it take to charge at Kia Charging Station?
- At its rated 90 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 21 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Kia Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Kia Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Kia Charging Station?
- Xobolt Charging Station, 0.8 km away, with CCS2. 4 further alternatives are listed on this page.
