Zevvy Plan a route

Duke Energy Charging Station, 1980 Pecan Ln, Kernersville, NC

Duke Energy Charging Station is an EV charging location at 1980 Pecan Ln, Kernersville, North Carolina, with CCS1 and CHAdeMO across 2 charge points rated up to 150 kW.

Where Duke Energy Charging Station is

1980 Pecan Ln, Kernersville, NC 27284, USA

Location detail for Duke Energy Charging Station
FieldValue
Street1980 Pecan Ln
CityKernersville
StateNorth Carolina
ZIP code27284
Coordinates36.07926, -80.10869

Connectors and power at Duke Energy Charging Station

Connector types recorded at Duke Energy Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop
CHAdeMODCFast charging on a highway stop

The highest output recorded for this location is 150 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Duke Energy Charging Station

Time to take a battery from 10 to 80 per cent at the 150 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 150 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Duke Energy Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh17 min
80 kWh56 kWh22 min
100 kWh70 kWh28 min

Charging around Duke Energy Charging Station

1 other charging location is mapped within 3 mi of Duke Energy Charging Station, 1 of them with DC fast charging.

Duke Energy Charging Station is one of 6 charging locations Zevvy has mapped in Kernersville, and one of 3 with DC fast charging. 1 location in Kernersville has a higher recorded output than its 150 kW.

Which cars can charge at Duke Energy Charging Station

Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Duke Energy Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Duke Energy Charging Station

Plan a trip through Kernersville

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Duke Energy Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Duke Energy Charging Station have?
CCS1 (DC fast) and CHAdeMO (DC fast) across 2 charge points, rated up to 150 kW.
Is Duke Energy Charging Station a fast charger?
Yes. It has DC fast charging (CCS1 and CHAdeMO), rated up to 150 kW.
How long does it take to charge at Duke Energy Charging Station?
At its rated 150 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 22 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Duke Energy Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Duke Energy Charging Station?
Any car with a CCS1 and CHAdeMO inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Duke Energy Charging Station?
Tesla Supercharger, 0.7 mi away, with NACS (Tesla). 4 further alternatives are listed on this page.

More charging near Duke Energy Charging Station