Electric Vehicle Charging Station, opp. sid, Kodaikanal
Electric Vehicle Charging Station is an EV charging location at opp. sid, Kodaikanal, Tamil Nadu, with CCS2 across 1 charge point rated up to 50 kW.
- ConnectorsCCS2
- Charge points1
- Rated output50 kW
Where Electric Vehicle Charging Station is
club, Goldan parkinn complex, opp. sid, Kodaikanal, Tamil Nadu 624101, India
| Field | Value |
|---|---|
| Locality | opp. sid |
| City | Kodaikanal |
| State | Tamil Nadu |
| Coordinates | 10.23433, 77.49169 |
| From Kodaikanal centre | 0.5 km south-east |
Connectors and power at Electric Vehicle Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Electric Vehicle Charging Station
Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 25 min |
| 45 kWh | 31.5 kWh | 38 min |
| 60 kWh | 42 kWh | 50 min |
Charging around Electric Vehicle Charging Station
9 other charging locations are mapped within 5 km of Electric Vehicle Charging Station, 3 of them with DC fast charging.
Electric Vehicle Charging Station is one of 10 charging locations Zevvy has mapped in Kodaikanal, and one of 4 with DC fast charging. 2 locations in Kodaikanal have a higher recorded output than its 50 kW.
Which cars can charge at Electric Vehicle Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Electric Vehicle Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Electric Vehicle Charging Station
- Zeon Charging StationKodai Resort Hotel |, Coaker's Walk, Kodaikanal, Tamil Nadu 624101, India0.3 km away · south-east
- MACHHotel Kodai International, 17/328, Laws Ghat Rd, Kodaikanal, Tamil Nadu 624101, India1.2 km away · north-east
- Zeon Charging StationJC Residency, Convent Rd, Naidupuram, Kodaikanal, Tamil Nadu 624101, India1.6 km away · north
- Hyundai Charging StationJC Residency, 1/188-3-4, Convent Rd, Naidupuram, Kodaikanal, Tamil Nadu 624101, India1.6 km away · north
- Zeon Charging StationChettiar Park Rd, near Mango hill resort, Kodaikanal, Tamil Nadu 624101, India1.9 km away · north-east
Plan a trip through Kodaikanal
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Electric Vehicle Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Electric Vehicle Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 50 kW.
- Is Electric Vehicle Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 50 kW.
- How long does it take to charge at Electric Vehicle Charging Station?
- At its rated 50 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 38 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Electric Vehicle Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Electric Vehicle Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Electric Vehicle Charging Station?
- Zeon Charging Station, 0.3 km away, with Type 2 AC. 4 further alternatives are listed on this page.
