Zevvy Plan a route

GE OC Charging Station, JCHH+MW7, Kottayam

GE OC Charging Station is an EV charging location at JCHH+MW7, Kottayam, Kerala, with Type 2 AC across 1 charge point rated up to 7.4 kW.

Where GE OC Charging Station is

JCHH+MW7, Kottayam - Kumarakom Rd, Kavanattinkara, Kumarakom, Kerala 686563, India

Location detail for GE OC Charging Station
FieldValue
LocalityJCHH+MW7
CityKottayam
StateKerala
Coordinates9.62917, 76.42979
From Kottayam centre11.0 km west

Connectors and power at GE OC Charging Station

Connector types recorded at GE OC Charging Station
ConnectorCurrentTypical use
Type 2 ACACSlower top-up over a longer stay

The highest output recorded for this location is 7.4 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at GE OC Charging Station

Time to take a battery from 10 to 80 per cent at the 7.4 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 7.4 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at GE OC Charging Station
Battery sizeEnergy addedMinimum time
30 kWh21 kWh2 hr 50 min
45 kWh31.5 kWh4 hr 15 min
60 kWh42 kWh5 hr 40 min

Charging around GE OC Charging Station

3 other charging locations are mapped within 5 km of GE OC Charging Station, 3 of them with DC fast charging. GE OC Charging Station has no DC fast charging recorded; the closest location that does is Tata Power Charging Station, 0.3 km south.

GE OC Charging Station is one of 36 charging locations Zevvy has mapped in Kottayam; 31 of them have DC fast charging. 32 locations in Kottayam have a higher recorded output than its 7.4 kW.

Which cars can charge at GE OC Charging Station

Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.

Compatible models at GE OC Charging Station
CarRated rangeInlet
Mahindra BE 6 (79 kWh)682 kmCCS2
Mahindra XEV 9e (79 kWh)656 kmCCS2
Mahindra XEV 9S600 kmCCS2
Mahindra BE 6 (59 kWh)556 kmCCS2
Mahindra XEV 9e (59 kWh)542 kmCCS2
Mahindra XUV400 EV456 kmCCS2
Mahindra eVerito140 kmType 2 AC
MG ZS EV461 kmCCS2
MG Cyberster443 kmCCS2
MG M9 EV430 kmCCS2

Is it working?

Zevvy has no live status for GE OC Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to GE OC Charging Station

Plan a trip through Kottayam

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is GE OC Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does GE OC Charging Station have?
Type 2 AC (AC) across 1 charge point, rated up to 7.4 kW.
Is GE OC Charging Station a fast charger?
No. Only AC charging is recorded at GE OC Charging Station, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Tata Power Charging Station, 0.3 km away.
How long does it take to charge at GE OC Charging Station?
At its rated 7.4 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 4 hr 15 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
How much does it cost to charge at GE OC Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at GE OC Charging Station?
Any car with Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total. This is an AC-only location, so charging will be slow.
What is the nearest alternative to GE OC Charging Station?
Tata Power Charging Station, 0.3 km away, with CCS2. 4 further alternatives are listed on this page.

More charging near GE OC Charging Station