Go Ec Charging Station, Chelavoor, Kozhikode
Go Ec Charging Station is an EV charging location at Chelavoor, Kozhikode, Kerala, with CCS2 across 1 charge point rated up to 90 kW.
- ConnectorsCCS2
- Charge points1
- Rated output90 kW
Where Go Ec Charging Station is
St. Thomas Province Of Lf Congregation Of Cst Fathers (Little Flower Complex, 7VX3+772, Wayanad Rd, Chelavoor, Kozhikode, Kerala 673571, India
| Field | Value |
|---|---|
| Locality | Chelavoor |
| City | Kozhikode |
| State | Kerala |
| Coordinates | 11.29813, 75.85313 |
| From Kozhikode centre | 9.1 km north-east |
Connectors and power at Go Ec Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 90 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Go Ec Charging Station
Time to take a battery from 10 to 80 per cent at the 90 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 90 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 14 min |
| 45 kWh | 31.5 kWh | 21 min |
| 60 kWh | 42 kWh | 28 min |
Charging around Go Ec Charging Station
6 other charging locations are mapped within 5 km of Go Ec Charging Station, 5 of them with DC fast charging.
Go Ec Charging Station is one of 46 charging locations Zevvy has mapped in Kozhikode, and one of 41 with DC fast charging. 2 locations in Kozhikode have a higher recorded output than its 90 kW.
Which cars can charge at Go Ec Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Go Ec Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Go Ec Charging Station
- BPCL Charging StationM/s. NISSI FUELS, BHARAT PETROLEUM RETAIL OUTLET AT CHELAVOOR, CALICUT Chelora, 7RWW+Q6C, Chelavoor, Kozhikode, Kerala 673009, India0.8 km away · west
- chargeMOD Charging StationKSEB 110 kv substation, Kuttikkattoor, Kozhikode, Kerala 673008, India3.2 km away · south
- chargeMOD Charging Station8V6M+M3F, NH 766, NH 766, Kozhikode, Kerala 673571, India3.6 km away · north-east
- chargeMOD Charging StationKUTTOTH ENTERPRISES, Vellimadukunnu - Iringadanpally-Kovoor Rd, Chevayoor, Kozhikode, Kerala 673017, India3.6 km away · south-west
- Zeon Charging Station7R9J+8FV Zeon charging station SK, Kovoor MLA Rd, Chevayoor, Kozhikode, Kerala 673017, India4.1 km away · south-west
Plan a trip through Kozhikode
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Go Ec Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Go Ec Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 90 kW.
- Is Go Ec Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 90 kW.
- How long does it take to charge at Go Ec Charging Station?
- At its rated 90 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 21 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Go Ec Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Go Ec Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Go Ec Charging Station?
- BPCL Charging Station, 0.8 km away, with CCS2. 4 further alternatives are listed on this page.
