Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang EV Charging Station, 499 chemin Boisville-Ouest, L'Étang-du-Nord, QC
Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang is a Circuit Electrique charging location at 499 chemin Boisville-Ouest, L'Étang-du-Nord, Quebec, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
- NetworkCircuit Electrique
Where Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang is
499 chemin Boisville-Ouest, L'Étang-du-Nord, QC, G4T 3J8
| Field | Value |
|---|---|
| Street | 499 chemin Boisville-Ouest |
| City | L'Étang-du-Nord |
| Province | Quebec |
| Coordinates | 47.36928, -61.95503 |
| Network operator | Circuit Electrique |
Connectors and power at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang
2 other charging locations are mapped within 5 km of Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang, none of them with DC fast charging. Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang has no DC fast charging recorded; the closest location that does is Electruc Circuit Charging Station, 6.4 km east.
Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang is one of 3 charging locations Zevvy has mapped in L'Étang-du-Nord; none of them have DC fast charging. No location in L'Étang-du-Nord has a higher recorded output than its 3.7 kW.
Which cars can charge at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang
- Electric Circuit Charging Station499 Chem. Boisville O, L'Étang-du-Nord, QC G4T 3J8, Canada0.0 km away · north
- Electrique Circuit Charging Station60 Chem. de la Martinique, L'Étang-du-Nord, QC G4T 3R6, Canada3.0 km away · east
- Circuit électrique Charging StationMagdalen Islands, QC G4T 3C9, Canada5.3 km away · east
- Electruc Circuit Charging Station500 Chem. Principal, Cap-aux-Meules, QC G4T 1E3, Canada6.4 km away · east
- Circuit électrique Charging Station416-426 Chem. Principal, Cap-aux-Meules, QC G4T 1E5, Canada6.5 km away · east
Plan a trip through L'Étang-du-Nord
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang a fast charger?
- No. Only AC charging is recorded at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Electruc Circuit Charging Station, 6.4 km away.
- How long does it take to charge at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Circuit Electrique sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to Municipalité des Îles-de-la-Madeleine - près de 499 Chemin Boisville O - Étang?
- Electric Circuit Charging Station, 0.0 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.
