Zevvy Plan a route

Ontario Charging Network LP, 6677 Meadowvale Town Centre Cir, Mississauga, ON

Ontario Charging Network LP is an EV charging location at 6677 Meadowvale Town Centre Cir, Mississauga, Ontario, with J1772 (Type 1) and CCS1 across 2 charge points rated up to 50 kW.

Where Ontario Charging Network LP is

6677 Meadowvale Town Centre Cir, Mississauga, ON, L5N 2R5

Location detail for Ontario Charging Network LP
FieldValue
Street6677 Meadowvale Town Centre Cir
CityMississauga
ProvinceOntario
Coordinates43.58351, -79.75978

Connectors and power at Ontario Charging Network LP

Connector types recorded at Ontario Charging Network LP
ConnectorCurrentTypical use
J1772 (Type 1)ACSlower top-up over a longer stay
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at Ontario Charging Network LP

Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at Ontario Charging Network LP
Battery sizeEnergy addedMinimum time
60 kWh42 kWh50 min
80 kWh56 kWh1 hr 5 min
100 kWh70 kWh1 hr 25 min

Charging around Ontario Charging Network LP

26 other charging locations are mapped within 5 km of Ontario Charging Network LP, 6 of them with DC fast charging.

Ontario Charging Network LP is one of 151 charging locations Zevvy has mapped in Mississauga, and one of 39 with DC fast charging. 20 locations in Mississauga have a higher recorded output than its 50 kW.

Which cars can charge at Ontario Charging Network LP

Any car with a J1772 (Type 1) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for Ontario Charging Network LP, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to Ontario Charging Network LP

Plan a trip through Mississauga

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is Ontario Charging Network LP working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does Ontario Charging Network LP have?
J1772 (Type 1) (AC) and CCS1 (DC fast) across 2 charge points, rated up to 50 kW.
Is Ontario Charging Network LP a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 50 kW.
How long does it take to charge at Ontario Charging Network LP?
At its rated 50 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at Ontario Charging Network LP?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at Ontario Charging Network LP?
Any car with a J1772 (Type 1) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to Ontario Charging Network LP?
Ivy Charging Station, 0.1 km away, with CHAdeMO and CCS1. 4 further alternatives are listed on this page.

More charging near Ontario Charging Network LP