Mercedes-Benz Charging Station, Mohali
Mercedes-Benz Charging Station is an EV charging location at Mohali, Punjab, with CCS2 across 1 charge point rated up to 60 kW.
- ConnectorsCCS2
- Charge points1
- Rated output60 kW
Where Mercedes-Benz Charging Station is
C-19, Phase 1, Sector 57, Industrial Area Phase 1, Sahibzada Ajit Singh Nagar, Punjab 160055, India
| Field | Value |
|---|---|
| City | Mohali |
| State | Punjab |
| Coordinates | 30.72999, 76.70604 |
| From Mohali centre | 3.0 km north |
Connectors and power at Mercedes-Benz Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Mercedes-Benz Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around Mercedes-Benz Charging Station
7 other charging locations are mapped within 5 km of Mercedes-Benz Charging Station, 6 of them with DC fast charging.
Mercedes-Benz Charging Station is one of 16 charging locations Zevvy has mapped in Mohali, and one of 14 with DC fast charging. 1 location in Mohali has a higher recorded output than its 60 kW.
Which cars can charge at Mercedes-Benz Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Mercedes-Benz Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Mercedes-Benz Charging Station
- BPCL Charging StationVILL-GARLE ON NH-344 A, ON NH-344A, AND, Phase 1, BETWEEN, Mohali Village, Langroya, Balachaur, Punjab 144521, India0.9 km away · east
- GLIDA Charging StationNear, new Grain Market, NH-21, Sector 39D, 39D, Sector 39, Chandigarh, 160036, India2.2 km away · north-east
- Tata Power Charging StationTDI Connaught Plaza, Sector 74-A, Airport Rd, TDI City, Sahibzada Ajit Singh Nagar, Punjab 160055, India2.4 km away · west
- Tata Power Charging StationTdi Business Centre, Sector 118, TDI City, Sahibzada Ajit Singh Nagar, Punjab 140307, India2.6 km away · west
- Powerbank Charging StationPP3H+2R4, Sector 61, Sahibzada Ajit Singh Nagar, Chandigarh, Punjab 160062, India3.8 km away · south-east
Plan a trip through Mohali
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Mercedes-Benz Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Mercedes-Benz Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 60 kW.
- Is Mercedes-Benz Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at Mercedes-Benz Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Mercedes-Benz Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Mercedes-Benz Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Mercedes-Benz Charging Station?
- BPCL Charging Station, 0.9 km away, with CCS2. 4 further alternatives are listed on this page.
