Zevvy Plan a route

GO TO-U Charging Station, 1671 Caribou St E, Moose Jaw, SK

GO TO-U Charging Station is an EV charging location at 1671 Caribou St E, Moose Jaw, Saskatchewan, with CCS1 across 1 charge point rated up to 160 kW.

Where GO TO-U Charging Station is

1671 Caribou St E, Moose Jaw, SK S6J, Canada

Location detail for GO TO-U Charging Station
FieldValue
Street1671 Caribou St E
CityMoose Jaw
ProvinceSaskatchewan
Postal codeS6J
Coordinates50.39658, -105.49150

Connectors and power at GO TO-U Charging Station

Connector types recorded at GO TO-U Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 160 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at GO TO-U Charging Station

Time to take a battery from 10 to 80 per cent at the 160 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 160 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at GO TO-U Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh16 min
80 kWh56 kWh21 min
100 kWh70 kWh26 min

Charging around GO TO-U Charging Station

5 other charging locations are mapped within 5 km of GO TO-U Charging Station, 2 of them with DC fast charging.

GO TO-U Charging Station is one of 10 charging locations Zevvy has mapped in Moose Jaw, and one of 6 with DC fast charging. 3 locations in Moose Jaw have a higher recorded output than its 160 kW.

Which cars can charge at GO TO-U Charging Station

Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for GO TO-U Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to GO TO-U Charging Station

Plan a trip through Moose Jaw

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is GO TO-U Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does GO TO-U Charging Station have?
CCS1 (DC fast) across 1 charge point, rated up to 160 kW.
Is GO TO-U Charging Station a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 160 kW.
How long does it take to charge at GO TO-U Charging Station?
At its rated 160 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 21 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at GO TO-U Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at GO TO-U Charging Station?
Any car with a CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to GO TO-U Charging Station?
FLO Charging Station, 2.2 km away, with CCS1 and CHAdeMO. 4 further alternatives are listed on this page.

More charging near GO TO-U Charging Station