eDrive Charging Station, Chembur, Mumbai, Maharashtra
eDrive Charging Station is an EV charging location at Chembur, Mumbai, Maharashtra, with CCS2 across 1 charge point rated up to 30 kW.
- ConnectorsCCS2
- Charge points1
- Rated output30 kW
Where eDrive Charging Station is
MR/BY-488, Pestom Sagar Rd Number 3, Chembur West, Pestom Sagar Colony, Chembur, Mumbai, Maharashtra 400089, India
| Field | Value |
|---|---|
| Locality | Chembur |
| City | Mumbai |
| State | Maharashtra |
| Coordinates | 19.07027, 72.90129 |
| From Mumbai centre | 2.6 km east |
Connectors and power at eDrive Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at eDrive Charging Station
Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 42 min |
| 45 kWh | 31.5 kWh | 1 hr 5 min |
| 60 kWh | 42 kWh | 1 hr 25 min |
Charging around eDrive Charging Station
51 other charging locations are mapped within 5 km of eDrive Charging Station, 45 of them with DC fast charging.
eDrive Charging Station is one of 224 charging locations Zevvy has mapped in Mumbai, and one of 184 with DC fast charging. 95 locations in Mumbai have a higher recorded output than its 30 kW.
Which cars can charge at eDrive Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for eDrive Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to eDrive Charging Station
- ACS Energy Charging Station3VFX+43H, Vidyanagar, Vidya Vihar East, Vidyavihar, Mumbai, Maharashtra 400077, India0.5 km away · north-west
- Tata Power Charging Station3V9R+CJH, Lokmanya Tilak Terminus Flyover, Tilak Nagar, Kurla, Mumbai, Maharashtra 400089, India1.0 km away · west
- Tata Power Charging Station3VHW+J83, Ramdev Pir Rd, near Sahney Indian Private Limited, Kirol Village, Vidyavihar West, Vidyavihar, Mumbai, Maharashtra 400086, India1.1 km away · north-west
- GLIDA charging stationAsher Titan Residential, Vallabhbaug Ln, Neelkanth Chhaya Co-op Housing Society, Mhada Colony, Sindhu Wadi, Ghatkopar East, Mumbai, Maharashtra 400077, India1.3 km away · north-east
- Synergy e mobility solutions pvt ltd Charging Station3VJQ+VC3, Amar Nagar, Nav Pada, Kurla, Mumbai, Maharashtra 400070, India1.9 km away · north-west
Plan a trip through Mumbai
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is eDrive Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does eDrive Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 30 kW.
- Is eDrive Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 30 kW.
- How long does it take to charge at eDrive Charging Station?
- At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at eDrive Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at eDrive Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to eDrive Charging Station?
- ACS Energy Charging Station, 0.5 km away, with Type 2 AC. 4 further alternatives are listed on this page.
