Ecoplug Charging Station, Noida
Ecoplug Charging Station is an EV charging location at Noida, Uttar Pradesh, with CCS2 across 1 charge point rated up to 160.2 kW.
- ConnectorsCCS2
- Charge points1
- Rated output160.2 kW
Where Ecoplug Charging Station is
G7GH+9Q7, Pocket C, Okhla Phase I, Okhla Industrial Estate, New Delhi, Delhi 110020, India
| Field | Value |
|---|---|
| City | Noida |
| State | Uttar Pradesh |
| Coordinates | 28.52592, 77.27942 |
| From Noida centre | 11.0 km west |
Connectors and power at Ecoplug Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 160.2 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Ecoplug Charging Station
Time to take a battery from 10 to 80 per cent at the 160.2 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 160.2 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 8 min |
| 45 kWh | 31.5 kWh | 12 min |
| 60 kWh | 42 kWh | 16 min |
Charging around Ecoplug Charging Station
22 other charging locations are mapped within 5 km of Ecoplug Charging Station, 18 of them with DC fast charging.
Ecoplug Charging Station is one of 83 charging locations Zevvy has mapped in Noida, and one of 55 with DC fast charging. 1 location in Noida has a higher recorded output than its 160.2 kW.
Which cars can charge at Ecoplug Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Ecoplug Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Ecoplug Charging Station
- Tata Charging StationG7GF+3V3, C Block Rd, Pocket A, Okhla Phase I, Okhla Industrial Estate, New Delhi, Delhi 110020, India0.5 km away · west
- Hindustan Petroleum Corporation Limited Charging StationG7HF+Q24, Pocket A, Okhla Phase I, Okhla Industrial Estate, New Delhi, Delhi 110020, India0.8 km away · north-west
- Tata Power Charging StationA-24/4, MOHAN CO-OP. INDL. ESTATE, Mathura Road, Tekhand, Okhla Phase I, Industrial Area, Okhla, New Delhi, Delhi 110044, India1.0 km away · east
- Ecoplug Charging StationRoad 13, Phase 2, Industrial Area, J, Okhla Phase II, Okhla Industrial Estate, New Delhi, Delhi 110020, India1.3 km away · north
- Tata Power Charging StationG7QM+35F Pacific Mall Jasola, AH2, Jasola Vihar, New Delhi, Delhi 110020, India1.3 km away · north
Plan a trip through Noida
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Ecoplug Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Ecoplug Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 160.2 kW.
- Is Ecoplug Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 160.2 kW.
- How long does it take to charge at Ecoplug Charging Station?
- At its rated 160.2 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 12 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Ecoplug Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at Ecoplug Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Ecoplug Charging Station?
- Tata Charging Station, 0.5 km away, with Type 2 AC. 4 further alternatives are listed on this page.
