GLIDA Charging Station, Sector 18, Noida
GLIDA Charging Station is an EV charging location at Sector 18, Noida, Uttar Pradesh, with CCS2 and Type 2 AC across 2 charge points rated up to 60 kW.
- ConnectorsCCS2, Type 2 AC
- Charge points2
- Rated output60 kW
Where GLIDA Charging Station is
Plot No - M, 03, Sector 18, Noida, Uttar Pradesh 201301, India
| Field | Value |
|---|---|
| Locality | Sector 18 |
| City | Noida |
| State | Uttar Pradesh |
| Coordinates | 28.56760, 77.32139 |
| From Noida centre | 7.7 km north-west |
Connectors and power at GLIDA Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
| Type 2 AC | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 60 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at GLIDA Charging Station
Time to take a battery from 10 to 80 per cent at the 60 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 60 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 21 min |
| 45 kWh | 31.5 kWh | 31 min |
| 60 kWh | 42 kWh | 42 min |
Charging around GLIDA Charging Station
46 other charging locations are mapped within 5 km of GLIDA Charging Station, 26 of them with DC fast charging.
GLIDA Charging Station is one of 83 charging locations Zevvy has mapped in Noida, and one of 55 with DC fast charging. 7 locations in Noida have a higher recorded output than its 60 kW.
Which cars can charge at GLIDA Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| Mahindra eVerito | 140 km | Type 2 AC |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
Is it working?
Zevvy has no live status for GLIDA Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to GLIDA Charging Station
- DLF Mall Of IndiaPlot M-03, Sector 18, Noida, Uttar Pradesh, 2013010.0 km away · south
- Statiq Charging StationNear, Dlf Mall Of India, MLCP, Sector 18, Noida, Uttar Pradesh 201301, India0.3 km away · north
- Wave OneL-2A, Pocket G, Sector 18, Noida, Uttar Pradesh, 2013010.3 km away · north-east
- Tata Power Charging StationWave One, Plot L2A, G Block, L2A1, Sector 18, Noida, Uttar Pradesh 201301, India0.4 km away · north-east
- Statiq Charging StationBerger Tower, Delhi Noida Direct Flyway, Sector 16B, Noida, Uttar Pradesh 201301, India1.1 km away · north-west
Plan a trip through Noida
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is GLIDA Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does GLIDA Charging Station have?
- CCS2 (DC fast) and Type 2 AC (AC) across 2 charge points, rated up to 60 kW.
- Is GLIDA Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 60 kW.
- How long does it take to charge at GLIDA Charging Station?
- At its rated 60 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 31 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at GLIDA Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
- Which cars can charge at GLIDA Charging Station?
- Any car with CCS2 and Type 2 AC. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to GLIDA Charging Station?
- DLF Mall Of India, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.
