SÉPAQ - Parc national d'Oka - Bureaux administratifs EV Charging Station, 2020, chemin d'Oka, Oka, QC
SÉPAQ - Parc national d'Oka - Bureaux administratifs is a flo charging location at 2020, chemin d'Oka, Oka, Quebec, with J1772 (Type 1) across 1 charge point rated up to 3.7 kW.
- ConnectorsJ1772 (Type 1)
- Charge points1
- Rated output3.7 kW
- Networkflo
Where SÉPAQ - Parc national d'Oka - Bureaux administratifs is
2020, chemin d'Oka, Oka, QC, J0N 1E0
| Field | Value |
|---|---|
| Street | 2020, chemin d'Oka |
| City | Oka |
| Province | Quebec |
| Coordinates | 45.47424, -74.06020 |
| Network operator | flo |
Connectors and power at SÉPAQ - Parc national d'Oka - Bureaux administratifs
| Connector | Current | Typical use |
|---|---|---|
| J1772 (Type 1) | AC | Slower top-up over a longer stay |
The highest output recorded for this location is 3.7 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at SÉPAQ - Parc national d'Oka - Bureaux administratifs
Time to take a battery from 10 to 80 per cent at the 3.7 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 3.7 × 60. This is the floor, not the typical: on AC the car's own onboard charger sets the ceiling, and many cars accept less than a post can supply. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 60 kWh | 42 kWh | 11 hr 20 min |
| 80 kWh | 56 kWh | 15 hr 10 min |
| 100 kWh | 70 kWh | 18 hr 55 min |
Charging around SÉPAQ - Parc national d'Oka - Bureaux administratifs
8 other charging locations are mapped within 5 km of SÉPAQ - Parc national d'Oka - Bureaux administratifs, 1 of them with DC fast charging. SÉPAQ - Parc national d'Oka - Bureaux administratifs has no DC fast charging recorded; the closest location that does is Circuit électrique Charging Station, 2.4 km south-west.
SÉPAQ - Parc national d'Oka - Bureaux administratifs is one of 9 charging locations Zevvy has mapped in Oka; 1 of them has DC fast charging. 2 locations in Oka have a higher recorded output than its 3.7 kW.
Which cars can charge at SÉPAQ - Parc national d'Oka - Bureaux administratifs
Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
Is it working?
Zevvy has no live status for SÉPAQ - Parc national d'Oka - Bureaux administratifs, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to SÉPAQ - Parc national d'Oka - Bureaux administratifs
- FLO Charging Station2020 Chem. d'Oka, Oka, QC J0N 1E0, Canada0.0 km away · north
- SÉPAQ - Parc national d'Oka - Stationnement Place communautaire2020 chemin d'Oka, Oka, QC, J0N 1E01.0 km away · south-east
- FLO Charging StationFX74+F6, 2020 Chem. d'Oka, Oka, QC J0N 1E0, Canada1.7 km away · south-east
- SÉPAQ - Parc national d'Oka2020 chemin Oka, Oka, QC, J0N 1E01.7 km away · south-east
- Circuit électrique Charging Station2020 Chemin d'Oka, Oka, QC J0N 1E0, Canada1.7 km away · south-east
Plan a trip through Oka
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is SÉPAQ - Parc national d'Oka - Bureaux administratifs working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does SÉPAQ - Parc national d'Oka - Bureaux administratifs have?
- J1772 (Type 1) (AC) across 1 charge point, rated up to 3.7 kW.
- Is SÉPAQ - Parc national d'Oka - Bureaux administratifs a fast charger?
- No. Only AC charging is recorded at SÉPAQ - Parc national d'Oka - Bureaux administratifs, which suits a longer stay rather than a quick highway stop. The nearest DC fast charger mapped is Circuit électrique Charging Station, 2.4 km away.
- How long does it take to charge at SÉPAQ - Parc national d'Oka - Bureaux administratifs?
- At its rated 3.7 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 15 hr 10 min. On AC the car's onboard charger sets the ceiling, so many cars will take longer than this.
- How much does it cost to charge at SÉPAQ - Parc national d'Oka - Bureaux administratifs?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. flo sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at SÉPAQ - Parc national d'Oka - Bureaux administratifs?
- Any car with a J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector. This location has no DC fast charging recorded, so expect a slower top-up.
- What is the nearest alternative to SÉPAQ - Parc national d'Oka - Bureaux administratifs?
- FLO Charging Station, 0.0 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.
