Zevvy Plan a route

County of Oxford EV Charging Station, 432594 Zenda Line, Otterville, ON

County of Oxford is an EV charging location at 432594 Zenda Line, Otterville, Ontario, with J1772 (Type 1) and CCS1 across 2 charge points rated up to 50 kW.

Where County of Oxford is

432594 Zenda Line, Otterville, ON, N0J 1R0

Location detail for County of Oxford
FieldValue
Street432594 Zenda Line
CityOtterville
ProvinceOntario
Coordinates43.91090, -80.71470

Connectors and power at County of Oxford

Connector types recorded at County of Oxford
ConnectorCurrentTypical use
J1772 (Type 1)ACSlower top-up over a longer stay
CCS1DCFast charging on a highway stop

The highest output recorded for this location is 50 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at County of Oxford

Time to take a battery from 10 to 80 per cent at the 50 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 50 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at County of Oxford
Battery sizeEnergy addedMinimum time
60 kWh42 kWh50 min
80 kWh56 kWh1 hr 5 min
100 kWh70 kWh1 hr 25 min

Charging around County of Oxford

No other charging location is mapped within 5 km of County of Oxford, so it is worth checking before you depend on it.

It is the only charging location Zevvy has mapped in Otterville.

Which cars can charge at County of Oxford

Any car with a J1772 (Type 1) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for County of Oxford, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to County of Oxford

Plan a trip through Otterville

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is County of Oxford working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does County of Oxford have?
J1772 (Type 1) (AC) and CCS1 (DC fast) across 2 charge points, rated up to 50 kW.
Is County of Oxford a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 50 kW.
How long does it take to charge at County of Oxford?
At its rated 50 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at County of Oxford?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at County of Oxford?
Any car with a J1772 (Type 1) and CCS1 inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to County of Oxford?
FLO Charging Station, 8.5 km away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near County of Oxford