GOEC EV Charging Station, Pidavoor, Panampatta
GOEC is a GO EC charging location at Pidavoor, Panampatta, Kerala, with CCS2 across 1 charge point rated up to 30 kW.
- ConnectorsCCS2
- Charge points1
- Rated output30 kW
- NetworkGO EC
Where GOEC is
SATHYAN MUKKU, Pidavoor, Panampatta, Kerala 689695, India
| Field | Value |
|---|---|
| Locality | Pidavoor |
| City | Panampatta |
| State | Kerala |
| Coordinates | 9.07115, 76.85620 |
| Network operator | GO EC |
Connectors and power at GOEC
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at GOEC
Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 42 min |
| 45 kWh | 31.5 kWh | 1 hr 5 min |
| 60 kWh | 42 kWh | 1 hr 25 min |
Charging around GOEC
3 other charging locations are mapped within 5 km of GOEC, 3 of them with DC fast charging.
GOEC is one of 2 charging locations Zevvy has mapped in Panampatta, and one of 2 with DC fast charging. No location in Panampatta has a higher recorded output than its 30 kW.
Which cars can charge at GOEC
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for GOEC, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to GOEC
- Ather Grid Charging StationAvaneeswaram - Pathanapuram Rd, Sathyanmukku, Panampatta, 3VC4+FFH, Pidavoor, Panampatta, Kerala 689695, India0.0 km away · north-east
- Goec Charging StationAnjaya complex, Salempuram, Pattazhy Vadakkekara, Enadimangalam, Kerala 689695, India3.0 km away · north
- chargeMOD Charging StationSastri Junction, Kunnicode, Kerala 691508, India5.0 km away · south
- Tata Power Charging StationMuthoot Automotive, Tata Motors Car Showroom, Kayamkulam - Punalur Rd, Vilakkuvettom, Punalur, Kerala 691331, India8.9 km away · south-east
- chargeMOD Charging StationNH183, Inchakkad, Mylom, Kerala 691560, India9.3 km away · south-west
Plan a trip through Panampatta
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is GOEC working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does GOEC have?
- CCS2 (DC fast) across 1 charge point, rated up to 30 kW.
- Is GOEC a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 30 kW.
- How long does it take to charge at GOEC?
- At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at GOEC?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. GO EC sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at GOEC?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to GOEC?
- Ather Grid Charging Station, 0.0 km away, with CCS2. 4 further alternatives are listed on this page.
