Ero G Electric Charging Station, Kovai to Salem Road, Perundurai
Ero G Electric Charging Station is a Relux Electric charging location at Kovai to Salem Road, Perundurai, Tamil Nadu, with CCS2 across 1 charge point rated up to 44 kW.
- ConnectorsCCS2
- Charge points1
- Rated output44 kW
- NetworkRelux Electric
Where Ero G Electric Charging Station is
"NH544, Kovai to Salem Road, perundurai , Tamilnadu, 638052
| Field | Value |
|---|---|
| Locality | Kovai to Salem Road |
| City | Perundurai |
| State | Tamil Nadu |
| PIN code | 638052 |
| Coordinates | 11.23077, 78.57301 |
| Network operator | Relux Electric |
Connectors and power at Ero G Electric Charging Station
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 44 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Ero G Electric Charging Station
Time to take a battery from 10 to 80 per cent at the 44 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 44 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 29 min |
| 45 kWh | 31.5 kWh | 43 min |
| 60 kWh | 42 kWh | 57 min |
Charging around Ero G Electric Charging Station
No other charging location is mapped within 5 km of Ero G Electric Charging Station, so it is worth checking before you depend on it.
Ero G Electric Charging Station is one of 3 charging locations Zevvy has mapped in Perundurai, and one of 3 with DC fast charging. 1 location in Perundurai has a higher recorded output than its 44 kW.
Which cars can charge at Ero G Electric Charging Station
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Ero G Electric Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Ero G Electric Charging Station
- BPCL Charging Station4HPR+7F3, Madhurapuri, Tiruchirappalli, Thuraiyur, Tamil Nadu 621010, India10.8 km away · south
- Sg Green Charging Station4JVW+RM, Perumalmalai Adivaram, Nagalapuram, Tamil Nadu 621002, India12.5 km away · south-east
- Hindustan Petroleum Corporation Limited Charging Station5FC2+WX6, Mettupalayam Rd, Mettupalayam, Tamil Nadu 621210, India14.7 km away · south-west
- Zeon Charging StationSandel Rock, Kolli Hills, 79P5+8P7 Zeon charging, Silverline Retreat Hotel, Vazhavandhanadu, Ariyurnadu, Valavanthinadu, Tamil Nadu 637411, India24.1 km away · west
Plan a trip through Perundurai
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Ero G Electric Charging Station working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Ero G Electric Charging Station have?
- CCS2 (DC fast) across 1 charge point, rated up to 44 kW.
- Is Ero G Electric Charging Station a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 44 kW.
- How long does it take to charge at Ero G Electric Charging Station?
- At its rated 44 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 43 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Ero G Electric Charging Station?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Relux Electric sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Ero G Electric Charging Station?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Ero G Electric Charging Station?
- BPCL Charging Station, 10.8 km away, with CCS2. 3 further alternatives are listed on this page.
