Zevvy Plan a route

SynergEV Charging Station, W1367 WI-160, Pulaski, WI

SynergEV Charging Station is an EV charging location at W1367 WI-160, Pulaski, Wisconsin, with CCS1 and J1772 (Type 1) across 2 charge points rated up to 120 kW.

Where SynergEV Charging Station is

W1367 WI-160, Pulaski, WI 54162, USA

Location detail for SynergEV Charging Station
FieldValue
StreetW1367 WI-160
CityPulaski
StateWisconsin
ZIP code54162
Coordinates44.67293, -88.30574

Connectors and power at SynergEV Charging Station

Connector types recorded at SynergEV Charging Station
ConnectorCurrentTypical use
CCS1DCFast charging on a highway stop
J1772 (Type 1)ACSlower top-up over a longer stay

The highest output recorded for this location is 120 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.

How long charging takes at SynergEV Charging Station

Time to take a battery from 10 to 80 per cent at the 120 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 120 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.

Minimum 10–80% charging time at SynergEV Charging Station
Battery sizeEnergy addedMinimum time
60 kWh42 kWh21 min
80 kWh56 kWh28 min
100 kWh70 kWh35 min

Charging around SynergEV Charging Station

No other charging location is mapped within 3 mi of SynergEV Charging Station, so it is worth checking before you depend on it.

It is the only charging location Zevvy has mapped in Pulaski.

Which cars can charge at SynergEV Charging Station

Any car with a CCS1 and J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.

Is it working?

Zevvy has no live status for SynergEV Charging Station, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.

Nearest alternative chargers to SynergEV Charging Station

Plan a trip through Pulaski

Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.

Open the route planner

Frequently asked questions

Is SynergEV Charging Station working right now?
We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
What connectors does SynergEV Charging Station have?
CCS1 (DC fast) and J1772 (Type 1) (AC) across 2 charge points, rated up to 120 kW.
Is SynergEV Charging Station a fast charger?
Yes. It has DC fast charging (CCS1), rated up to 120 kW.
How long does it take to charge at SynergEV Charging Station?
At its rated 120 kW, taking a battery of 80 kWh from 10 to 80 per cent takes at least 28 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
How much does it cost to charge at SynergEV Charging Station?
Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. Check the tariff displayed at the unit before plugging in.
Which cars can charge at SynergEV Charging Station?
Any car with a CCS1 and J1772 (Type 1) inlet can plug in directly; a car with a different inlet needs an adapter rated for this connector.
What is the nearest alternative to SynergEV Charging Station?
Electric Vehicle Charging Station, 9.9 mi away, with J1772 (Type 1). 4 further alternatives are listed on this page.

More charging near SynergEV Charging Station