Amar Business Zone EV Charging Station, Veerbhadra Nagar, Pune
Amar Business Zone is a JIO BP Pulse charging location at Veerbhadra Nagar, Pune, Maharashtra, with CCS2 across 1 charge point rated up to 30 kW.
- ConnectorsCCS2
- Charge points1
- Rated output30 kW
- NetworkJIO BP Pulse
Where Amar Business Zone is
Swati Park, Veerbhadra Nagar, Pune, Maharashtra , 411045
| Field | Value |
|---|---|
| Locality | Veerbhadra Nagar |
| City | Pune |
| State | Maharashtra |
| PIN code | 411045 |
| Coordinates | 18.56414, 73.77646 |
| From Pune centre | 9.8 km north-west |
| Network operator | JIO BP Pulse |
Connectors and power at Amar Business Zone
| Connector | Current | Typical use |
|---|---|---|
| CCS2 | DC | Fast charging on a highway stop |
The highest output recorded for this location is 30 kW. Zevvy stores a power rating only where the source published one, so this figure is read from the record rather than estimated.
How long charging takes at Amar Business Zone
Time to take a battery from 10 to 80 per cent at the 30 kW recorded here. Formula: minutes = battery kWh × 0.7 ÷ 30 × 60. This is the floor, not the typical: DC charging slows as the battery fills, and a car never draws more than its own limit, so real sessions run longer. Battery sizes are examples; check your own car's usable capacity.
| Battery size | Energy added | Minimum time |
|---|---|---|
| 30 kWh | 21 kWh | 42 min |
| 45 kWh | 31.5 kWh | 1 hr 5 min |
| 60 kWh | 42 kWh | 1 hr 25 min |
Charging around Amar Business Zone
34 other charging locations are mapped within 5 km of Amar Business Zone, 28 of them with DC fast charging.
Amar Business Zone is one of 162 charging locations Zevvy has mapped in Pune, and one of 142 with DC fast charging. 68 locations in Pune have a higher recorded output than its 30 kW.
Which cars can charge at Amar Business Zone
Cars sold in India with published specifications, matched to the connectors above. A CCS2 car also fits a Type 2 AC post, because a CCS2 inlet is a Type 2 socket with DC pins beneath it.
| Car | Rated range | Inlet |
|---|---|---|
| Mahindra BE 6 (79 kWh) | 682 km | CCS2 |
| Mahindra XEV 9e (79 kWh) | 656 km | CCS2 |
| Mahindra XEV 9S | 600 km | CCS2 |
| Mahindra BE 6 (59 kWh) | 556 km | CCS2 |
| Mahindra XEV 9e (59 kWh) | 542 km | CCS2 |
| Mahindra XUV400 EV | 456 km | CCS2 |
| MG ZS EV | 461 km | CCS2 |
| MG Cyberster | 443 km | CCS2 |
| MG M9 EV | 430 km | CCS2 |
| MG Windsor EV | 332 km | CCS2 |
Is it working?
Zevvy has no live status for Amar Business Zone, so we don't show one. Chargers go down without warning, which is why the nearest alternatives are listed below.
Nearest alternative chargers to Amar Business Zone
- Zeon Charging StationAditya School, 20, Pancard Club Rd, near Aditya English Medium School, Baner, Pune, Maharashtra 411069, India0.6 km away · south-east
- Bijlify Charging StationHQ8C+89Q, Baner - Mahalunge Rd, Veerbhadra Nagar, Baner, Pune, Maharashtra 411069, India0.6 km away · west
- Mercedes-Benz Charging StationBhandari Motors, Mercedes Benz, Veerbhadra Nagar Rd, Mahalunge, Pune, Maharashtra 411045, India1.0 km away · west
- Tata Power Charging StationShop No. 6,7, Crystal Kia Axis Centra, 8, Bengaluru - Mumbai Hwy, Baner, Pune, Maharashtra 411045, India1.0 km away · south-west
- ACS Charging StationRegency Classic, A2, Pashan Hwy Side Rd, Baner Annex, मोहन नगर, Baner, Pune, Maharashtra 411045, India1.3 km away · south-west
Plan a trip through Pune
Zevvy's planner picks charging stops for your car and starting charge across the full route, not just this location.
Open the route plannerFrequently asked questions
- Is Amar Business Zone working right now?
- We can't tell you. Zevvy has no live status for this charger and would rather say so than guess. If you're counting on it, have a look at the nearby alternatives on this page, and check the unit when you get there.
- What connectors does Amar Business Zone have?
- CCS2 (DC fast) across 1 charge point, rated up to 30 kW.
- Is Amar Business Zone a fast charger?
- Yes. It has DC fast charging (CCS2), rated up to 30 kW.
- How long does it take to charge at Amar Business Zone?
- At its rated 30 kW, taking a battery of 45 kWh from 10 to 80 per cent takes at least 1 hr 5 min. Expect longer in practice: DC charging slows as the battery fills, and the car may accept less than the post supplies.
- How much does it cost to charge at Amar Business Zone?
- Tariffs are not recorded in Zevvy's dataset for this location, so we do not publish a price. JIO BP Pulse sets the tariff at this site; check their app or the unit before plugging in.
- Which cars can charge at Amar Business Zone?
- Any car with CCS2. From the models Zevvy lists for India that includes Mahindra BE 6 (79 kWh), Mahindra XEV 9e (79 kWh), Mahindra XEV 9S, Mahindra BE 6 (59 kWh) and Mahindra XEV 9e (59 kWh), among 10 in total.
- What is the nearest alternative to Amar Business Zone?
- Zeon Charging Station, 0.6 km away, with CCS2. 4 further alternatives are listed on this page.
